Laserfiche WebLink
Checker Schedule of Values <br /> Contract Far. `Checken Z Hills <br /> Project Number- _CK-1 <br /> A B C <br /> Scheduled Value SubtolalbyDw <br /> Item <br /> tb. Desc lod-of Work <br /> 1 General Ra4ubemena 31.917.00 <br /> 2 verve/ 5,450.00 <br /> 3 Building Permit(By Oymer) <br /> 4 General Conditions 26,467.OD <br /> 5 Site Wort 188,055.00 <br /> 6 Clearing,Grating,Paving 72,675A0 <br /> MOTAI—nce <br /> 7 Site ULOdin 27,250A0 <br /> 8 PeMous Concrete,Curbs,Sidewalks 57.280.00 <br /> 9 Misc Site Concrete 7,SOO110 <br /> 10 Dumpsler Gates 5,40U.00 <br /> Il landuaping and lulgation 17950.00 <br /> 12 ConaeM and Mason 69,2 TOD <br /> 13 Concrete foundadom/Slab/Slem Wall 28,347.00 <br /> 14 SOBSixay 350.OD <br /> 15 Masonry(DemntHe Wall on Gall and 40,535A0 <br /> 16 Marls 6,265IDO <br /> 17 Structural Steel,Joist&Deck <br /> I6 Mbc Moab 6.265.OD <br /> 19 Ca"." <br /> 20 Carpentry-Framing and Siding <br /> 21 Cabinets and MOhmrk <br /> 22 Themal IS Molstms Protection 7D0.00 <br /> 73 Roo0ng <br /> 24 Insulation <br /> 25 Moisture Barrier Building 700.OD <br /> 26 Deon&Window <br /> 27 Doan Frames&Hardware <br /> 28 Windows <br /> H Finishes 1,778A0 <br /> 30 Stuaa and Cultured Stone <br /> 31 Parch Caning Soffit Facie <br /> 32 PaintingfWatenproofing 11778D0 <br /> 33 Drywall <br /> _ 34 Ceramic TOa <br /> 35 SpeciaMes <br /> 36 Spedahies <br /> 37 Med..I l 25.8001)0 <br /> 36 Plumbing 16=100 <br /> 39 Gas 8.300.00 <br /> 40 HVAC/Refddgeratlon 1.000.00 <br /> 41 Elecodual 24,200.00 <br /> 42 Electrical 24,200,00 <br /> 43 46,ODD.00 <br /> as Budgeted Contingency S.000A0 <br /> 45 GLlmurance <br /> 46 Conft-..Overhead Profit 41,000110 <br /> 47 TOTALS 393947.00 993947.00 <br />