My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21614
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 12:35:30 PM
Creation date
4/15/2020 12:35:26 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-21614
Building Department - Name
PIERCE,JOHN & BETTY
Address
6136 RIDGEWAY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
service. <br /> The customer's electrical service will be disconnected for approximately 6 hours to <br /> complete the installation. <br /> The generator will be programed for bi-monthly test cycles to ensure proper <br /> operation. <br /> The customer will be responsible for arranging the installation of a LP tank, LP <br /> regulator, and plumbing to the generator location. <br /> This generator has an hourly fuel consumption of 2.03 gallons of LP at 500 load <br /> which equates to 194 .88 gallons over the course of 4 days of continuous use. This <br /> is the recommended length of run time for this installation. <br /> All work performed by 'Pattie Electric will be subject to an electrical inspection <br /> by the building department and be carried out in a workmanlike manner to ensure <br /> compliance with national and local electrical codes. <br /> > 7/26/2019 FRI 12:33 PM> LELAND A: <br /> Needs disconnect scheduled for 8/6/19 by the utility provider. <br /> Needs permit and inspection scheduled for 8/6/19 <br /> City of Zephyrhills may require a load calculation for the permit. Request <br /> direction from DP if necessary for the load calc. <br /> Generator and transfer switch need to be placed and underground conductors <br /> installed on 8/5/2019. Remainder of wiring to tie into service to be completed on <br /> 8/6/2019 following the disconnect. <br /> > 8/2/2019 FRI 11:39 AM> LELAND A: <br /> Tech will need help unloading and placing the generator on 8/5/19 <br /> Price is Per Stated Quote 1.00 2100.00 2100.00 <br /> Subtotal <br /> 2100.00 <br /> All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or <br /> deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above <br /> the estimate. All agreements contingent upon delays beyond our control. Purchaser agrees to pay all costs of collection,including attorney's fees. <br /> Signature Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.