Laserfiche WebLink
I, ( <br /> • r^,t e <br /> ERICAN . - 'VISA <br /> Ryman Roofing Inc. E�RES r - <br /> 5%fee for credit card processing. <br /> A Division of Rymon Construction,Inc. <br /> 36413 SR 54• Zephyrhills, Florida 33541 Proposal# <br /> Phone(813)782-6094 • Fax(813)788-6773 N0. <br /> 1-855-Go-Ryman (1-855-467-9626) • Lic.#CCC 1325505 Estimate#002800 <br /> 2 www.RymanRoofing.com <br /> Serving all of Central Florida Job# 5(Q o 5 <br /> Owner/Purchaser.Lonnie Sims Date: 7/23/19 <br /> Claim#: Insurance Company: <br /> Policy# <br /> Job Address: 39784 Meadowood Loop City: Zephyrhills Zip: 33542 <br /> Mail to Address: E-Mail Address: <br /> Home #: 813.715.2395 Cell #: Business #: <br /> JQ Complete tear off of existing Asphalt shingles Additional Notes/Special Concerns. Includes <br /> One layer included Install new GAF HD Timberline <br /> ✓Q•Secure all loose roof decking as needed according lifetime shingles <br /> to Florida Building Codes <br /> Q✓ Roof dried in with Synthetic GAF Seal a Ridge <br /> GAF ProStart starter strips <br /> Rl Install new valley metal with galvanized metal Rhino Synthetic underlayment <br /> P/ Install new 6 "drip edge color: White <br /> 0 Install new lead boots <br /> F/ Install all new general roof vents <br /> [✓ Install new FlShingle ❑Metal Tile <br /> Modified Butimen FITPO 1 sheet of plywood included <br /> Manufacturer (shingle, metal or tile) GA1= <br /> Manufacturer (1Po or Mod. Bitumen) <br /> F/ Color:(Shingle,MetalorTile) Hickory <br /> Color:(TPOorMOD.Bitumen) Permit and scheduling of inspections <br /> F/ All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet <br /> Q All materials, labor and permits furnished Base Price*$ $9)420.00 <br /> M-7 Provide a 5 Vear labor warranty <br /> Additional Items: <br /> Payment Method: Rl Check# Cash Financing ❑Insurance Claim <br /> ❑ Credit Card# Exp. Date CC ID# <br /> Down Payment:$ $3,297.00 Amount Financed:$ Approx. Monthly Payment:$ <br /> PaymentTerms: 35% down and balance upon completion <br /> Extras: <br /> 0lo* se Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"above. Customer Initial <br /> Deficient 1/2"plywood replaced at a cost of$ 65.00 per sheet in the roof field,which includes labor&materials.All other wood work/ad- <br /> nal labor,such as,but not limited to,valley rebuilding,rafter replacement, I decking,etc.will be a rate of$5.00 per lineal foot plus the <br /> cost of materials. <br /> THIS BECOMES A BINDI ONTRACT UPON CEPTANCE OF PROPOSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> 1 ACCEPT THIS P AND HEREBY CERTI THA I HAVE READ AND FULLY UNDERSTAND THE PROVISIONS OF THIS CONTRACT. <br /> Purchaser: Date: 7/23/19 <br /> Purchaser: Estimator: Tommy <br />