Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25..R403.5,3Hot water pipe insulation <br /> insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> foll6w' ing: <br /> Piping V.inch (1.9.1 mm)and larger in nominal diameter: <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to:a distribution manifold: <br /> Piping located under a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower door test shad be provided before C.O: <br /> 26. A cony of the enerzy cacls shall be with permit at all times. <br /> 27. Conti of rnal insulation report shalt be provided with permit before rnaL <br /> 28. No fence.-pool or'screen enclosure :is issued withihis permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-.Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />