My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
39450 SOUTH AVE (10)
Zephyrhills
>
Building Department
>
Building Plans
>
39450 SOUTH AVE (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2020 8:54:50 AM
Creation date
4/26/2020 8:53:18 AM
Metadata
Fields
Template:
Building Plans
Street #
39450 SOUTH AVE
Location
A-12
Contractor
CARR CONSTR
Description
T-HANGAR FOUNDATION
Owner
CITY OF ZEPHYRHILLS
Building Plans - Permit #
7464
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 � J <br /> Carr Contract_ ing ,Services Inc. <br /> General Contractor CCTC060646 Plumbing Contractors CFC 142b l62 <br /> 3602 Oakwood Drive- Wesley Chapel, FL 33543 <br /> Phone: 813-629= 961 Fax: 813-780-8657 <br /> Date: Jan. 17,2008 Zephyrhills.Municipal Airport <br /> To: LPA Group T-Hangar Development <br /> Name:Jim Goodwin Project# 11-07-14 <br /> Phone: 813-889-3892/Fa-k: 813-889-3893 <br /> Letter of Submittal <br /> Subcontractor:NA Supplier: OSI Buildings ?._ �1t <br /> Manufacturer: OSI Buildings Specification/Section#: +V;�r <br /> Product:.Foundation Plans <br /> F r•. Review X A�ppppraval <br /> ,4M4r ANTRAM8 SWAgaR&jr•Stamp Here <br /> Project Number and Nam — 2`� �n <br /> Submittal Number: <br /> Deviations: <br /> None'': <br /> As listed: es„b i,,y srri..,. <-- C,vCv"�= ✓t� �r,, 17+h , <br /> Reference Specification lumber: v,>�� �- �`��� Id'Vi U w <br /> Reforence Drawing Number: <br /> Space Requirement: <br /> As designed: <br /> Different, as listed: <br /> Contractor has jr7ian' submired for approval. <br /> i ►�atrd: tits, <br /> Engineer Stamp,Here <br /> PROVED O APPROVED AS CORRELfi-D <br /> ® NOT APPROVED ® REVISE AND RESUBMIT <br /> Checker is only fat cdnfa'mance with the design concept <br /> of tha Pro)s.'. contractor is resi'ronsibin for dimensions <br /> to be confirmed and correlated at the job site; for <br /> iiformation that perlalns solely to the i hricaGon processes <br /> or to isclx>;quos of c3romrlion;and for womiration of the <br /> wort(of an trades. ApprONal of'stems does not rolievo the <br /> contractor from.ccmplying-,ith an requirements of the <br /> Contract Dom menls <br /> T INCORPORATED <br /> ! Z! ZL <br /> j/ <br /> 1 � ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.