Laserfiche WebLink
Grease Monkey Remodel <br /> Friday, August 03, 2018 <br /> Page 2 of 9 <br /> Grease Monkey- 5847 Gall Blvd, Zephyrhills, FL <br /> GENERAL REQUIREMENTS LABOR/MATERIALS <br /> Plans and Specifications PAID <br /> Permits: Zoning, Building, Environmental, Other $1,800.00 <br /> Survey $500.00 <br /> Impact Fee $1,500.00 <br /> Administrative Costs $900.00 <br /> Job Superintendent $7,000.00 <br /> Subtotal $11,700.00 <br /> SITE PREP <br /> Job-site security/silt fencing soil erosion control $250.00 <br /> Job Portable toilet $500.00 <br /> Demolition/ Dumpster and removal $6,000.00 <br /> Clear and grub removal $800.00 <br /> Subtotal $7,550.00 <br /> ON-SITE WATER/SEWER <br /> City water and sewer <br /> Subtotal $0.00 <br /> UTILITIES <br /> Town Water: Tap fees and hookup $750.00 <br /> Town Sewer: Tap fees and hookup <br /> Electrical: Permit, overhead connection fee, hookup $850.00 <br /> Gas: Permit, connection fee, installation <br /> LPN: Tank installation, hookup <br /> Gas tank installation <br /> Telecom hookup <br /> Temporary electric $450.00 <br /> Subtotal $2,050.00 <br /> EXCAVATION & EARTHWORK <br /> Permits: Zoning, Building, Environmental, Other <br /> Each Pit Stock Area (at one end in each Pit) $3,500.00 <br /> Dig 3 new pit trenches, backfill compact 2 trenches $8,500.00 <br /> Subtotal $12,000.00 <br /> FOUNDATION <br /> Utilize existing exterior footers and one interior wall <br /> footer dividing lobby and bay one. $15,000.00 <br /> Subtotal $15,000.00 <br /> OTHER MASONRY/PAVING <br /> Masonry walls Use existing walls where possible and <br /> add to existing walls to achieve 14' heights. $10,000.00 <br /> Initialed by: Owner Contractor Y!' <br />