Laserfiche WebLink
Grease Monkey Remodel <br /> Friday, August 03, 2018 <br /> Page 4 of 9 <br /> Acoustic ceilings for lobby $1,800.00 <br /> Subtotal $6,800.00 <br /> INTERIOR FINISH <br /> Interior Doors, pre hung (total 3) $780.00 <br /> Interior Trim: Vinyl Baseboard, $560.00 <br /> Floor epoxy paint floors (slip resistant) $6,000.00 <br /> Interior Painting all drywall and Block $4,000.00 <br /> Specialty Carpentry $0.00 <br /> Subtotal $11,340.00 <br /> Bath <br /> Wall mount sinks in bathrooms $600.00 <br /> Moen fixtures $360.00 <br /> American standard toilet $550.00 <br /> Paper towel dispenser $400.00 <br /> Toilet paper holders $125.00 <br /> Subtotal $2,036.00 <br /> Equipment <br /> All equipment provided by Franchise <br /> Subtotal $0.00 <br /> Total $171,616.00 <br /> Overhead Percentage 8% $13,729.20 <br /> Profit Margin 8% $13,729.20 <br /> Total Overhead and Profit $27,458.40 <br /> Subtotal <br /> TOTAL CONSTRUCTION COSTS $198,029.40 <br /> *Owner to reserve a 10% contingency for unforeseens/omissions. <br /> *No budget provisions included for any EPA issues that may arise. <br /> Article 2.1. The Owner agrees to purchase and the Contractor agrees to construct the above <br /> mentioned structure and fixtures attached thereto in Zephyrhills, Pasco County, <br /> Florida according to the construction documents dated 8/1/2018, signed by NAB, <br /> Naji A Banna P.E. and forthcoming aesthetic/nonstructural specifications provided <br /> by Grease Monkey Corporate Office. <br /> Article 3. TIME OF COMPLETION <br /> Initialed by: Owner Contractor !�r' <br />