Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> .24. In accordance with the Land Development Code, lots shall be sodded before final at least_ 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.pipe insulation <br /> Insulation-for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:. <br /> Piping 31. inch (19.1 mm) and larger in.nominal diameter.. <br /> Piping serving more than one dwelling unit. <br /> Piping located,outside the conditioned space:. <br /> Piping from the water heater to a distribution manifold:, <br /> Piping located under a floor slab.. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O. <br /> 26. A cony of the enerey cacls shall be with permit at all times. <br /> - 7Z CooV of final insulation report shall be provided with permit before fnal <br /> 28. No fence, pool or screen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />