Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 of the.2016 N.-E.0 <br /> 24. In accordance with the Land Development Cade,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25:.R403.5.3Hot water pipe insulation <br /> Insulation-for hot water-pipe with a minimum thermal resistance (R-volue)of R-3.shall.be applied to the <br /> following: <br /> Piping h inch (19.1 mm)and larger in nominal diameter.. <br /> Piping:serving more than one dwelling unit. <br /> Piping located.outside the conditioned space:. <br /> Piping from the water heater to a distribution manifold:. <br /> Piping'located under a floor slab. <br /> Buried in piping.- <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blawer-door test shall be provided before C.O: <br /> 26. A copy ofthe energy-circle shall bye;with permit at all times <br /> 27. Cony of final-insulation report shafl he provided with permit before final <br /> 28.No fence,pool or'screen enclosure :is issued With:this permit <br /> F.F.E:-Finished Floor Elevation <br /> F.B.C-Florida Building Code ba' Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities.Act N.E.C.-National Electric Code(2016) <br />