Laserfiche WebLink
Submitted To: Quote M <br /> West Coast Management 80S8F3 <br /> Address: Date: <br /> 4734 20th Street, 6-4-19 <br /> U at t t � ®®� tit <br /> City: State: Zip Code: <br /> Git Zephyrhills FL 33542 <br /> nc, Phone ff: Fax M <br /> 813-908-0766- Office <br /> Email Address: <br /> State Certified CCC042846 prn wcmanagement.info <br /> State Certified CGC1507166 Job Name: Job Phone M <br /> Repair <br /> 1905 N 406 Street •Tarnpa,.Florida 33605 Job Location: <br /> Phone: (81-3) 620-4797 e Fax: (813) 626-1756 Same <br /> We hereby submit specifications and estimates for: <br /> Shinklle Replacement: <br /> 1) Pull all necessary permit and.file Notice of Commencement. <br /> 2) Tear.off existing roof an haul away all debris. <br /> 3) Inspect woodwork and make necessary repairs at an additional cost as follows: <br /> $2.00 per sq. ft.on 1 2"plywood decking. $2.50 per sq.ft.on 5/8"plywood when required. <br /> $2.50 per linear ft.o Ix6 plank decking. $4.00 per linear ft. on 2x4 structural lumber. <br /> $4.50 per linear ft.on Ix6 wood fascia. $1.50 per linear ft.on Ix2 fascia drip. <br /> $.30 per sq.ft.for additional layer of shingles found $6.50 per linear ft. on Ix6 wood Cedar fascia. <br /> 4) Re-nail entire deck per Florida Building Code. <br /> 5) Furnish and install#30 f It as shingle underlayment. <br /> 6) Furnish and install new "eave drip and soil stack flashings. <br /> 7) Furnish and install new Ridge Vent or off ridge ventilation. <br /> 8) Furnish and install 367'm ide valley liner as necessary. <br /> 9). Furnish and install 3 tab. shingles per manufacturer's specifications. <br /> 10)-Furnish and install Hip aid Ridge Cap shingles. <br /> 11) Furnish and install Start shingle as-first row. <br /> 12)Furnish our(3)three-ye contractor's workmanship warranty. <br /> 13)Furnish ma_nufactuer 25 ear shingle warranty. <br /> Options: <br /> 1) Furnish and install dimensional shingles instead of 3 tab shingles.ADD$450 <br /> 2) Furnish and install peel and stick underlayment instead of#30 felt. ADD$900.00 <br /> The roofing Industry is currently expei iencing price volatility in asphalt related products.Because firm prices cannot be obtained from suppliers,prices are subject to <br /> change.If there is an increase In the pr ce of asphalt related products,charge to the contractor subsequent to making this proposal/contract,the proposal/contract shall <br /> be increased to reflect the additional cost to the contractor,uoon submittal of written documentation thereof. <br /> Seven th usand one hundred dollars 00/100 7,100.00 <br /> Sum for the above: Dollars$ <br /> Due upon completion. <br /> Payment to be made as follows: <br /> All materials guaranteed to be as specified or ual to.All work to completed In a workmanlike manner <br /> according to standard practices.Any alterations or eviation from above specifications Involving extra cost will Salesman: <br /> be executed only upon written orders and will ome an extra charge over and above the estimate. All Signature: <br /> damage and other necessary insurance to hold coi tractor harmless from tenants claims.our workers are fully Ehsa n Sidd i ui 813-777-7647 <br /> agreements contingent upon strikes,accidents ord Iays beyond our control.Owner to carry fire,tornado,water Name: q <br /> covered by Workman's Compensation Insurance.,my monies not paid as agreed will Incur 1%%per month <br /> Interest rate.Any cost Incurred by Quality Roofing,l icfor litigation will be paid bynon-prevailing party. Email Address: Ehsan@!2ualitV-Roofine.com <br /> Acceptance of Contract: The above price,specifications and conditions are satisfactory and are <br /> hereby accepted.You are authorized to do work as pecifled.Payment will be made as outlined above. Owner/Agent <br /> Signature: <br /> Date of 7—// Name: !:;AVK A/ � <br /> Acceptance: Icy <br /> Note:This proposal maybe Zlthdrawn lo if not accepted within 30 days from date at top. Title: <br />