NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned.assumes responsibility for compliance with any
<br /> applicable deed.:restrictions.
<br /> UNLICENSED CONTRACTORS,AND CONTRACTOR RESPONSIBILITIES: If the owner
<br /> r has hired a contractor-1 or
<br /> contractors,to-undertake work,.they maybe required to be licensed-in accordance with state-and-local regulations. If'the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under:state"law. - If the owner or intended contractor are uncertain as-to what licensing requirements may-apply for the
<br /> intended work, they are advised to contaictthe Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore,--if-the owner has hired a contractor or contractors, he-is advised to have the contractor(s) sign
<br /> portions of the "contractor Black" of-this-application-for-which they wil[be-responsible.-,If you, as the owner sign as the
<br /> contractor, that may be.an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION.IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation-Impact-Fees.and,Recourse-Recovery Fees may apply to the construction of new buildings, change of
<br /> use Jn existing buildings, or expansion of existing buildings,.as specified in-Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The Undiarsigfned.*Iaiso-,urfderstands, that such fees, as-may-be due, will-be identified at the time of
<br /> permitting. It is-further understood that Transportation,Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release; If the-project does not-involve a certificate of occupancy or
<br /> final power-release; the fees,must be paid prior,tp permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br /> fees areAue,.-they.must.be paid prior to,permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter.71,3, Florida Statutes,as amended): If valuation of work is$2,:500.,00 or:more; I.
<br /> certify that 1, the applicant, have been provided with a-copy of, the "Florida-,Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared.by.the Florida;Department of Agriculture and Co'nsumer Affairs. If the applicantt.is someone
<br /> other than the"owner", I certify that Fhave obtained a copy of the above.described document and-promise in good faith to
<br /> deliver it to the"owner"'prior to commencement.
<br /> CONTRACTORIS/OWNER'S:AFFIDAV—IT: I certify that all-the information:in this.application,is accurate,and that.all.work .
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is:
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced.prior to issuance of a permit and that all work will be,performed to meet-standards of all laws regulating
<br /> construction, County. and City codes, zoning regulations, and land development regulations in the jurisdiction. -I also.
<br /> certify that I understand that the regulations of other government agencies may apply to,the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:,
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and-Environmentally Sensitive
<br /> Lands,WaterMastewater-Treatment:
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department of Health & Rehabilitative SerVices/Envilronmental Health Unit-Wells, Wastewater-Treatment.,
<br /> Septic Tanks.
<br /> US-Environmental Protection Agency-Asbestos abatement.-
<br /> Federal Aviation Authority-Runways.
<br /> I understand.-that-the;following,-restrictions apply-to-the-use of'fill:
<br /> Use of fill-is not allowed in Flood Zone-W"unless expressly permitted;
<br /> If the fill material is, to.be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> compensating volume"will,be.submitted.at time of permitting-which is prepared-by-a-professional engineer
<br /> licensed by the State of Florida. . I
<br /> If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem-wall
<br /> construction, I certify that fill will be used only to fill the area within the:stem wall.
<br /> If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties., If use of-fill is-found to-adversely affect adjacent properties, the owner may--be--cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre whl&are elev6ted..by fill$�can.engineered drainage plan;is required.
<br /> If I am*the AGENT FOR THE OWNER, I promise in.good faith to inform-the-owner of the permitting.conditions setf6rth'in
<br /> this,affidavit prior to-commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing., signs, wells, pools, air conditioning,,-,gas,-or other installations not specifically-included in the-application. A
<br /> permit-issued.shall be construed to be a license to proceed.with,the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions_of the technical codes, nor shall issuance of a perm,it prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall-become invalid
<br /> unless the work authorized, by such permit is commenced within six months of permit-issuance, or if work authorized-by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
<br /> may be•requestedjin writing;,from the Building Official fora period not to exceed ninety (90) days and will demonstrate:
<br /> justifiable cause forthe.extensi6n'. If work ceases for ninety-(90)consecutive-days,the job is considered abandoned'.
<br /> WARNING-TO OWNER- YOUR, FAILURE TO RECORD ANOTICEOF-COMMENCEMENT.MAY RESULT IN;'YOUR
<br /> PAYING' TWICE FOR IMPROVEMENTS TOYOUR PROPERTY. IF YOU'INTEND.TO OBTAIN'FINANCINGI CONSULT-
<br /> -WITH_YOUR,-_.LENDER_-_6RAN ATTORNEY BEFORE-RECORDING YOUR NOTICE OF COMMENCEMENT.,
<br /> FLORIDA JURAT(F.S.117.03)
<br /> OWNER-OR AGENT CONTRACTOR
<br /> Subscribed and swom to(or affirmed)before me this Supiscibed and sworn to,(or-affi d before me this
<br /> byrme 1p(
<br /> Who Is/ani personally knowrt-to me or has/have produced Who is/are'p sonally kn wn to me br:has/have produced-
<br /> as
<br /> zeolgi2 as,identification.
<br /> Notary Public A Notary Public
<br /> Commission No. C Issi
<br /> Name of Notary type pon!pq&s -p
<br /> Name, p nri ri ft W W 6 a INEBOMS
<br /> • Comm sonIG27457 2022E
<br /> Expims December 12,2022 L F41umm"Mmalice
<br /> m1my Fatft tinsumra NO
<br />
|