Laserfiche WebLink
L <br /> 23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In: accordance with the Land Development Code,lots shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot.Water pipe insulation <br /> Insulation for hot water. pipe with a minimum thermal resistance(R-value) of R-3 shall.tie applied to the <br /> following: <br /> Piping.31,inch (19.1 mm)and larger in.nominal diameter. <br /> Piping;serving mope than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:water heater to:a distribution manifold. <br /> Piping Iodated under a floor slab. <br /> Buried in piping. <br /> Supply and return piping iri recirculation-systems other than demand recirculation systems. <br /> 25: Blower:door test shall be provided before C.O: <br /> 26 A copy of the energy cacls shall be with wermit at all times <br /> 27 Covy of final.insulation report slialh be provided with permit before fnat; <br /> 28. No fence,pool or'screen enclosure .is issued with this.Perm it.. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.0 Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.=Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />