My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21750
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 8:11:44 AM
Creation date
5/11/2020 8:11:41 AM
Metadata
Fields
Template:
Building Department
Company Name
VILLAGE GROVE
Building Department - Doc Type
Permit
Permit #
19-21750
Building Department - Name
FRITTS,ANGES HARRELL
Address
38777 VULCAN CIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total Investment(Before Discount) <br /> Less Del Air Discount <br /> Less Additional Service Discount <br /> Less Down Payment <br /> Remaining Balance <br /> flit;(, -_4i+1 ? 0 1 "-)'ii! - - _--- - - .. <br /> Option 2: <br /> Customer Acceptance: Date: <br /> Company Approval: J Date: 08/21/2019 12:46 PM <br /> Company Representative:Scott Richardson, SRichardson@delair.com, (813)323-1852 <br /> Install Date: 08/26/2019 <br /> Notes <br /> Del-Air is an authorized Lowe's service provider and is pleased to provide this proposal on their behalf. <br /> Homeowner is responsible to stay home(1)full day for the Building Department Inspection <br /> All applicable sales and local taxes are included. <br /> Proposal valid 60 Days: <br /> All necessary materials and supplies to complete installation are included. <br /> Operational ductwork,venting,electrical wiring and drains are used as needed. <br /> Used(replaced)equipment is removed and recycled as appropriate. <br /> Used refrigerant is reclaimed and recycled in accordance with EPA Standards. <br /> Work area is cleaned upon completion. <br /> Proper operation is explained to you. <br /> Thank you for the opportunity to discuss your comfort needs. <br /> Installations include: <br /> Clean work area at job completion <br /> Dispose of Old Equipment <br /> New code approved hurricane straps <br /> New galvanized secondary drain pan <br /> New horizontal hanging kit <br /> New in-line safety float switch <br /> New pan safety float switch <br /> Permit <br /> Reconnect&clean existing drain line <br /> Reconnect existing supply plenum to new unit using 1-1/2"antimicrobial insulation <br /> August 21, 2019 10:09:37 AM Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.