My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21797
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21797
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 8:46:09 AM
Creation date
5/11/2020 8:46:05 AM
Metadata
Fields
Template:
Building Department
Company Name
MOORES FIRST ADDITION
Building Department - Doc Type
Permit
Permit #
19-21797
Building Department - Name
FAULKNER,DAVID & MOODY,ANNE
Address
4930 6TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERICAN �'','; VISAEXPRESS° <br /> Ryman Roofing Inc. <br /> 5%fee for credit card processing. <br /> A Division ofRymon Construction,Inc. <br /> 36413 SR 54 •Zephyrhills, Florida 33541 Proposal# <br /> Phone(813) 782-6094- Fax(813)788-6773 No. <br /> 1-855-Go-Ryman (1-855-467-9626) • Lic.#CCC 1325505 Estimate# 001700 <br /> www.RymanRoofing.com � ( <br /> Serving all of Central Florida Job# .�-& f <br /> - -- Owner/Purchaser.Rebecca-Mandy — - Date: 8/16/1-9---- <br /> Claim#: Insurance Company: <br /> Policy.# <br /> Job Address: 4930 6th St City: Zephyrhills Zip: 33540 <br /> Mail to Address: E-Mail Address: <br /> Home #: 813-312-0740 Cell #: Business #: <br /> 0✓ Complete tear off of existing Asphalt shingles Additional Notes/Special Concerns: Includes <br /> One layer included Install new GAF Timberline hd dimensional limited <br /> Q Secure all loose roof decking as needed according lifetime shingles <br /> to Florida Building Codes <br /> - -- dried-Roofanedinwith Synthetic------------- - - ---- — -- ----- -- <br /> Rhino roof synthetic underlayment <br /> Q✓ Install new valley metal with galvanized metal <br /> �✓ Install new 6 "drip edge color. Peel and stick in the valleys <br /> �✓ Install new lead boots <br /> F7 Install all new general roof vents <br /> 0✓ Install new ZShingle ❑Metal Tile <br /> Modified Butimen ❑TPO <br /> 0✓ Manufacturer (shingle, metal or tile) (-,AF Two sheets of plywood included <br /> Manufacturer (7o or Mod. Bitumen) <br /> F7 Color.(Shingle,MetalorTile) Slate <br /> Color:(TPOorMOD.Bitumen) Permit and scheduling of inspections <br /> 0 All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet <br /> n✓ All materials,labor and permits furnished Base Price*$' 77453.00 <br /> M✓ Provide a 5 Vear labor warranty <br /> Additional Items: <br /> Payment Method: Check# 0 Cash Financing Insurance Claim <br /> ❑ Credit Card# Exp.Date CC ID# <br /> Down Payment:$ Amount Financed:$ Approx. Monthly Payment:$ <br /> PaymentTerms: 35%down and balance upon completion <br /> Extras: <br /> *Base Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"above. Customer Initial <br /> Deficient 1/2"plywood replaced at a cost of$65.00 per sheet in the roof field,which includes labor&materials.All other wood work/ad- <br /> 1 onal labor,such as,but not limited to,valley rebuilding, rafter replacement, 1x decking,etc.will be a rate of$5.00 per lineal foot plus the <br /> cost of materials. <br /> THIS BECOMES A BINDING CONTRACT UPON ACCEPTANCE OF PROPOSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> I ACCEPT THIS PROP SAL AND HEREBY.ERT FY TH T I HAVE READ AND FULLY UNDERSTAND THE PROVISIONS OF THIS CONTRACT. <br /> Purchaser: Date: 8/16/19 <br /> Purchaser: Estimator. Ed <br />
The URL can be used to link to this page
Your browser does not support the video tag.