Laserfiche WebLink
'23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot water pipe insulation. <br /> Insulation for hot water pipe With a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping�1. inch (1.9.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside'the conditioned space: <br /> Piping'from the water heater to:a distribution manifold-, <br /> Piping.located under a floor Slab. <br /> Buried in piping. - <br /> Supply and-return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A cony of the enemy cacls shall be:with permit at all tines. <br /> 27 Copy of final insulation:-i0ort-shall-be provided with Permit before fnaL <br /> 28. No fence,-pool or-screen enclosure-:is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />