Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall.be sodded before final at least.10 <br /> feet around the structure. <br /> 25.. R403.5,3Hof water'pipe insulation. <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value)of R-3 shall be applied to the <br /> following:: <br /> Piping -1.inch (1.9.1 mm)and larger in nominal diameter., <br /> Piping;serving more than one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from the:water heater to a distribution manifold.. <br /> Piping.located.under a floor slab. . <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26 A cony ofthe energy cacls-shall be with permit at all times <br /> 27. Copu of final insulation report shall be Provided with Permit before fnaL <br /> 28 No fence, Pool or screen enclosure .is issued with:this permit.- <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act_ N.E.C.-National Electric Code (2016) <br />