Laserfiche WebLink
23. Tamper- kesistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Develop_meet Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31, inch (19.1 mm) and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26. A copy of the energy cacls shall be with Permit at all times <br /> 27 Copy oftinalYnsulation retiort shall be provided ivith Permit before rinal <br /> 28.No fence, Pool or screen enclosure Is issued with.this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />