Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall.be sodded before final at least'l0 <br /> feet around the structure. <br /> 25. R403.5.3Hot.wateryipe insulation. <br /> Insulation for.hot.water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping v, inch (1.9.1 mm) and larger in nominal diameter. <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the conditioned space: <br /> m Piping fro the water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A cony of the enerQy cacls'shall be with hermit at all times- <br /> 27. COpy offinal insulation report-shall be provided with permit before finaL <br /> 28. No fence,pool or enclosure .is issued withfencepool or screen enclosure issued with This permit." <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C--Florida Building Code 6�'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act. N.E.C.-National Electric Code(2016) . <br />