Laserfiche WebLink
f <br /> 23. Tamper.'Resistant-Receptacles in accordance with 406.11 of-the 2016 N..E.C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot.water pipe with a minimum thermal resistance (R-value)of R-3 shall be applied to the <br /> following: <br /> Piping V.inch-(1.9.1 mm) and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the**ter-heater to a distribution manifold.. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower,door test shall be proviided.before C.O. <br /> 26. A cony of the enerrgyx cacls shall be with permit at all times <br /> 27. Copy of final-insulation report shall be provided with permit before rinab <br /> 28.No fence.-pool or screen enclosure .is issued witkthi <br /> k permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />