Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or <br /> contractors to undertake work, they may be required to be licensed in accordance with.state and local regulations. If the <br /> contractor is not licensed as required by law, 'iboth the owner and contractor may be'cited for a misdemeanor violation <br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the <br /> intended work, they are advised to contact the 10asco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired; alcontractor or contractors, he is advised to have the'contractor(s) sign <br /> portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the <br /> contractor, that may be an indication that he;is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of <br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or <br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact <br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 713,(Florida Statutes, as amended): If valuation of work is$2,500.00 or more, I <br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's <br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other than the"owner",.I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner"prior to commencement. <br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I ;ce'rtify that all the information in this application is accurate and that all work <br /> will be done in compliance with all applicable Laws regulating construction, zoning and land development. Application is <br /> hereby made to obtain a permit to do worK!and installation as indicated. I certify that no work or installation has <br /> commenced prior to issuance of a permit and Ithat all work will be performed!to meet standards of all laws regulating <br /> construction, County and City codes, zoning 'regulations, and land development regulations in the jurisdiction. I also <br /> certify that I understand that the regulations of,other government agencies may;apply to the intended work, and that it is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: <br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands,Water/Wastewater Treatment. <br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls,,Docks, Navigable Waterways. <br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> - US Environmental Protection Agency-Asbestos abatement. <br /> - Federal Aviation Authority-Runways'. <br /> I understand that the following restrictions applylto the use of fill: <br /> Use of fill is not allowed in Flood Zone W" unless expressly permitted. <br /> If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a <br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> If the fill material is to be used in 'Flood Zone "A" in connection with a permitted building using stem wall <br /> construction, I certify that fill will beiused only to fill the area within the stem wall. <br /> If fill material is to be Used in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties. If use of fill is found to;adversely affect adjacent properties, the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br /> acre which are elevated by fill, an!,engineered drainage plan is required. <br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in <br /> this affidavit prior to commencing construction! I understand that a separate permit may be required for electrical work, <br /> plumbing, signs, wells, pools, air conditioning,i;gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or <br /> set aside any provisions of the technical codes; nor shall issuance of a permit prevent the Building Official from thereafter <br /> requiring a correction of errors in plans, construction or violations of any codes. 'Every permit issued shall become invalid <br /> unless the work authorized by such permit is;commenced within six months of permit issuance, or if work authorized by <br /> the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension <br /> may be requested, in writing, from the Building(Official for a period not to exceed ninety (90) days and will demonstrate <br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned. <br /> WARNING TO OWNER: YOUR FAILURE TO' RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR <br /> PAYING TWICE FOR IMPROVEMENTS10 YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT <br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR/NOTICE OF COMMENCEMENT. <br /> FLORIDA JURAT(F.S.1 7.0 ) <br /> OWNER OR AGENT CONTRACTOR <br /> Subscribed and sworn to Tor affirmed) efore me this Subscribed and sworn to(or affirmed)before me this <br /> /-o-mug-111 by Ashlee Callahan 23-Au9-19 by Ashlee Callahan <br /> Who is/are personally known to me or hasihave PF9dWGe4 Who is/are personally known to me or <br /> as identification. as identification. <br /> Notary Public Notary Public <br /> Commission No. FF98537 Commission No. FF98537 <br /> Elissa M.Holleran Elissa M.Holleran <br /> Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped <br /> .� L C.rtri,�s�r�NtPecsa7r <br /> (r+�_p'�`ai'dii'4ikAut•3�9�(+«� � x�lp�6�,q� R <br /> 6211t>-th%.'Dy vj�llwe <br /> sa�a�rtip <br />