Laserfiche WebLink
23. Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation. <br /> insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V4 inch (19.1 mm)and larger in.nominal.diameter. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside th'e conditioned space. <br /> Piping from the water-heater to,a distribution manifold.. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blower door test shall be provided before C.O, <br /> 26.A copy of the energy cacls-shall be with permit at all times <br /> 27. Copy of rMal insulation iepoit-shafl be ptvvided with permit before fnaZ <br /> 28. .No'fence,pool or screen enclosure :is issued with:thispermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />