Laserfiche WebLink
s <br /> v <br /> 21 Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hotwater'pipe insulation <br /> insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V.inch (19.1 mm) and larger in nominal diameter. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the.water heater to a distribution_ manifold.. <br /> .Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25: Blower door test shall be provided before C.Q: <br /> 26 A copy of-the-energr cacls shall be with permit at all.times <br /> 27. Cope of rnal insulation:report shaft be provided with permit before_ fnaL <br /> 28. No fence, pool or enclosure :is issued with:thispermit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />