Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 Of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-.value) of R-3 shall be applied to the <br /> following: <br /> Piping �1, inch (19.1 mm)and larger in, nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation_ systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26 A copy of the energy-cacls shall be.with permit at all times.- <br /> -2 7 Copy of Thal-insulation report-shalt be provided with perfnit before rnaL <br /> 28.No fence,pool or-screen enclosure :is issued withihispermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 b Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />