Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 ofthe 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots.shall be-sodded before final at least 10 <br /> feet around the structure. <br /> .25. R403.5,3Hot water pipe insulation, <br /> insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3/,inch (19.1 mm)and larger in.nominal diameter. <br /> Piping serving more than;one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold._ <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided.before C.Q. <br /> 26.A cony of the enemy eacls shall be=with permit at all times: <br /> 27 Copy of final insulation reoort shaft be Provided with Permit before rina- <br /> 28. No fence,pool or enclosure -is issued with.this permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code.6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />