` `NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit
<br /> which may Ua �a�oovo�mnC n� The vndom��u�sumoo ' subject�xcump compliance
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: i, the owner has hired o contractor ur
<br /> contractors m undertake work,they be required tuh licensed in accordance with state and lo |regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may uu cited for o misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> Intended work,they are advised 0ocontact the Pasco County Building Inspection Division—Licensing Section o*7o7-847-
<br /> 8009 Furthonnom, if the owner has hired m contractor or contractors, he is advised to have the sign
<br /> portions of the"contractor Block"uf this application for which they will h*responsible. If you, ou the owner sign as the
<br /> contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION vMPACTIUTILITIESIMPACT AND RESOURCE RECOVERY FEES: The undersigned undmrstand
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
<br /> use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving-a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release,the fees must~=paid prior to permit issuance. Furthermore,if Pasco County WaterlSewer Impact
<br /> fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I
<br /> certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver It to the'owner"prior to commencement.
<br /> CONTRACTOR!S/OWNEFVS AFFIDAVIT: I certify that all the information in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is
<br /> hereby made m obtain o permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Welland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> ' Southwest Florida Water Management [xmhot-Wel|x. Cypress 8oyheodo, VVaUond Amuv' ,wmdng
<br /> Watercourses.
<br /> ' Army Corps ofEngineers-Seawalls, Navigable
<br /> ' Department of Health m Rehabilitative menxoox/Envmo ntal Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> ' "S Environmental"Protection"y"'"v-"°"""="a""==^
<br /> Federal Aviation
<br /> |understand that the following restrictions apply to the use offill:
<br /> ' Use of fill is not allowed in Flood Zone~V"unless expressly permitted.
<br /> ' If the fill material is to he used in Flood Zone "K, it is understood that a drainage addressing
<br /> .compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State o[Florida.
<br /> ' If the fill material iamue used |n Flood Zone 'K In connection With o permitted building using stem wall
<br /> construction,|certify will Ue used only m fill the area within the stem wall.
<br /> ' If fill material is to be used in any area, | certify that use of such fill Will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one(1)
<br /> acre which are elevated by fill,an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this afridavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing,signs,wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or
<br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit Issuance,or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
<br /> may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate
<br /> justifiable cause for the extension. ..work ceases for ninety`-~_consecutive days,the,job_considered abandoned.
<br /> WARNING ToOWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT
<br />
|