My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20557
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:52:11 AM
Creation date
2/17/2021 8:52:10 AM
Metadata
Fields
Template:
Building Department
Company Name
PARKHILL
Building Department - Doc Type
Permit
Permit #
19-20557
Building Department - Name
DOUGLAS,DONNA
Address
38749 NORTH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESIDENTIAL 5139 2nd Street <br /> COMMERCIAL Zephyrhills,FL 33542 <br /> REMODEL/REHAB CBC #1251062 (813) 610—8909 <br /> RESTORATION <br /> Quality, Like Ethics, Should Not Be Conditional <br /> 11/7/2018 <br /> Project Scope Summary <br /> Project: <br /> Owner: Donna Douglas <br /> 38749 North Ave <br /> Zephyrhills, FL 33542 <br /> Following is a scope summary of remodel work at the above subject property: fit,AA <br /> �► �°`��'�� <br /> General: RKgNP�--gO O%t,q,6®V` <br /> 1. Demo kitchen,hall bath, and garage bath/laundry area A�1Lw F`0pND 5\3% GO® 11%S <br /> 2. Replace front entry door GODS N� EG F TEpN�(R1� <br /> 3. Replace all windows(excluding sliding glass door) N t D ENE G, S <br /> 4. Close existing garage bath window. pRDoNPND� <br /> 5. Replace all interior doors. <br /> 6. Remove garage overhead door for opening conversion to window. <br /> Nov 3 0 20i0 <br /> Kitchen: tt� <br /> 1. Construct island for range,relocate range electric througl m o Vl VF� <br /> 2. Rewire to current code. C�JY of- <br /> 3. Replumb sink and run in-slab water to island for"pot fill" <br /> 4. Install new cabinetry. <br /> Hall bath: <br /> 1. Install new tub,toilet and fixtures. <br /> 2. Retile and install new vanity. <br /> Master Suite: <br /> 1. Open slab,replumb drains for relocation of toilet and shower,plumb for vanity sinks, close slab. <br /> 2. Fill garage floor with 2500 psi concrete to main house floor level. <br /> 3. Frame for closets and bath area. <br /> 4. Block enclose existing garage door opening and install window. <br /> a. Epoxy#5 rebar block into existing opening sides and one cell each side of window opening into <br /> slab and lintel. <br /> b. Fill cells at sides and each side of window opening. <br /> 5. Install window in new opening. <br /> 6. Install HVAC ductwork to condition new master suite space. <br /> 7. Electric wire new master suite. <br />
The URL can be used to link to this page
Your browser does not support the video tag.