Belcher Contractors &Roofing, Inc.
<br /> Note:All work performed by Belcher Contracting&Roofing,Inc.,Inc will meet or surpass The Florida Building Code.
<br /> Warranty:The warranty stated on the reverse of this contract is expressly in lieu of all other warranties and guarantees,expressed or implied.
<br /> Contractor's liability for Its warranty shall be limited to remedying,at its own expense,any defect in the workmanship proximately resultingfroni
<br /> the failure of the Contractor to perform the work in a skillful and workmanlike.Contractor reserves the tight to remedy any defect Contractor car?
<br /> authorize the Owner/Buyer to hire others but assumes no responsibilitvfor work perfornned by others and shall not pay for labor and material
<br /> expense in connection with the hiring of others that exceeds written agreement between Belcher Contracting&Roofing,Inc,inc and Owner/Buyer.
<br /> 1.owner must consult at Owner's expense an engineer or architect concerning design factors such as slope,drainage,insulation,specification at
<br /> field walls and equipment details.
<br /> 2. The following conditions are hereby made a part of the proposal on the reverse side of this document and are to be considered a part of the
<br /> contract entered into between both parties. Upon signing the acceptance on the reverse side,this proposal becomes a contract
<br /> 3. This contract is subject to review by management personnel of the Contractor.Contractor reserves the right to cancel this contract prior to the
<br /> start of the work to be performed in the event we find the cost to complete the work varies from the initial standard pricing do to human error orl
<br /> behalf of the representative of the Contractor.In the event of this occurrence,Contractor shall advise the Owner and adjust the price accordingly.
<br /> In the event the Owner is not in agreement with the adjusted price,the Contractor shall notes the Owner of the cancellation of the contract.In such
<br /> instance,Contractor will return any deposit Owner has made toward the job in full.
<br /> 4.Should concealed or unknown conditions in an existing structure be at variance with conditions indicated in the description of the work to be
<br /> performed,or should concealed or unknown conditions in a»existing structure of an unusual nature,differing materially from those ordinarily
<br /> encountered and generally recognized as inherent in work of the character provided for in this Contract be encountered,Contract price shall be
<br /> equitably adjusted?upon notice thereoffrom Contractor to the Owner.
<br /> 5.Belcher Contracting&Roofing,Inc,Inc.assumes no responsibility whatsoever for oral promises.All terms and conditions must appear in
<br /> writing and appear on this contract.There are no promises,representations or understanding outside of this instrument unless provided in a written
<br /> agreement and signed by both parties.No representative or employee of Belcher Contracting&Roofing,Inc,Inc shall have the power to waive or
<br /> to be deemed or held to have waived any provision hereof,unless such waiver shall be in writing and signed by Belcher Contracting&Roofing,Inc,
<br /> Inc or Its duly authorized representative.
<br /> 6.L-Flashing in wails and chimneys will not be removed.(Should the L-Flashing have to be replaced,the additional charge will be determined as
<br /> needed.)
<br /> 7.Soffit repair or replacement is not a part of this contract unless otherwise stated Screened enclosures are to be removed and replaced by the
<br /> Owner.Solar units are to be removed and replaced by the Owner.
<br /> 8.Belcher Contracting&Roofing,Inc,Inc.assumes no responsibility whatsoeverfor liabilities arising from roofs not meeting 118"in 12"minimum
<br /> slope as required by The South Florida Building Code or any other municipal,county or state requirements.Belcher Contracting&Roofing,Inc,
<br /> Inc accepts no responsibility for ponding or standing water.
<br /> 9.Belcher Contracting&Roofing,Inc,Inc assumes no responsibility for damagess arising from acts of nature such as hurricanes or toniadoes,
<br /> lightning,etc or any other acts beyond our control. We also assume no responsibility for damage caused by plants,termites or negligence on the
<br /> part of the Owner.
<br /> 10.Contractor shall not be responsible for or liable for any damages to Owner If Contractor Is delayed at any time in the progress of the work by
<br /> any act or neglect of owner or by any separate Contractor employed by the Owner,or by changes ordered by Owner in work,or by labor disputes,
<br /> fire unusual delay in transportation,adverse weather conditions,unavoidable casualties,or any causes beyond the Contractor's control,or by delay
<br /> authorized by the Owner.
<br /> I L Due to the nature of the work to be done at the Owner's request,_Belcher Contracting&Roofing,Inc,Inc will not be responsible for any cracks
<br /> in the ceiling or walls.Belcher Contracting&Roofing,Inc,hie will not be responsible for cracks in drivewi vs,curbs and sidewalks,for falling
<br /> insulation,cracked or falling plaster,for damage to flowers,shrubs and other plant life,for damage to interior fixtures or contents,or for debris
<br /> filtered through exposed beams ceilings,due to the loading,unloading,removal or replacement of the roof. '
<br /> 12.During the course of the roofing work,the customer agrees to not hold Belcher Contracting&Roofing,Inc,Inc liable for leakage or damage to
<br /> interior contents that might occur from the date of commencement of roof repairs,re-roofing,or other roofing services through the date of
<br /> completion ofsuch work.
<br /> 13.Contractor shall not be held responsible for damage to pool or patio f urniture or any other exteriorfixtures.It is the Owner's responsibility to
<br /> take necessary precautions to cover or conceal such items before the roofprocess begins.
<br /> 14.Belcher Contracting Be Roofing,,Inc,Inc shall not and cannot be held responsible for any roofing material such as cement tile,shingles,metals,
<br /> woods,etc.changing color or shape. _
<br /> 15.Belcher Contracting&Roofing,Inc,Inc shall not be held responsible for water lines,copper tubing,electrical wiring,pvc piping,etc in attic
<br /> space If damaged do to roof nail penetration through the decking.
<br /> 16.Payment ofail or part of this'contract shall be due as stated under the payment terms on the reverse side of this contract.Payment to Contractor
<br /> shall In no way be contingent upon?acceptance of workperformed by others.Payment shall not be contingent upon inspections by local building
<br /> authorities or any other Inspector.Payments due and unpaid under the Contractor shall bear Interest from the date payment is due at the rate of
<br /> eighteen percent(18%)per ann«m.If the Owner does not pay the Contractor the payments specified under this Contract the Contractor may stop
<br /> the work until payment of the amount owing has been received.In such event,the Contract price shall be increased by the amount of the
<br /> Contractor's,reasonable cost of shutdown,delay and start-up.If it becomes necessary to incur any expenses in the collection of any money due
<br /> herewider,including reasonable attorney's fees,these expenses will be paid by the Owner/Buyer or his Acting Agent
<br /> 17.Service warranty and/or punch list work will cease and not be performed by Contractor If owner's payment as set forth in this contract is not
<br /> made in a timely manner.
<br /> 18.If contract is cancelled after 3 days from the date ofsigning,the Owner/Buyer shall forfeit 50%of any deposit that has been made.
<br /> 19.It shall be the sole obligation of the Owner to determine the existence of any restrictions contained in deed%subdivision or neighborhood rules
<br /> and regulations which might relate to or restrict the improvements outlined in this contract.Contractor shall have no liability or responsibility for
<br /> any such nonconformity to or with such restrictions or requirements.Contractor shall be entitled to payment fronh Owner/Buyer of all sums due
<br /> hereunder notwithstanding any injunction or prohibition against the work as a result of any violation ofsuch restriction or requirement.
<br /> 20.In the event that state,county or municipal codes or regulations require work not expressly set forth in this contract and/or differing materially
<br /> fn•om that generally recognized as inherent in work of the character provided for In this contract,as a condition for approval by such authority,any
<br /> extra cost for Contractor's labor and materials shall be the sole obligation of the Owner.In the event the substrate roof condition results in ponding
<br /> pursuant to the Standard Building Code and modifications are required to correct the current substrate roof so ponding will not occur,Contractor
<br /> will notify the Owner/Buyer upon learning of such requirements.
<br /> 21.Purchaser agrees to pay Belcher Contractors&Roofing,Inc the cash price(plus 3.2%surcharge if sales Is a credit sale that specifies interest
<br /> charge
<br />
|