Laserfiche WebLink
ROW SW EOP CL EOP ROW . G <br /> e <br /> ALL EMSTING FACILITIES <br /> WILL BE LOCATED,POT 60, I Ron tier <br /> ltt'er <br /> HOLED,AND VERIFIED I <br /> BEFORE ANY 16' 241 SB' <br /> LONSTRUCTpN,INOROER I <br /> TO AVGOD CONFLICTS I COMMUNICATIONS <br /> neTRio HORQONTALGLEARANCEFROMAL PROPOSED PLACEMENT 12' j 12' <br /> ALL OTHER UDLITES 17X30 22K HANDHOLE <br /> ADDITIONAL DEPTH OR LENGTH OF I EXISTING DUCT <br /> I I PROJECT: Date: <br /> BORES WILL BE DONE IF NEEDED IN OVER I <br /> FIELD TO AVOID ANY POTENTIAL I 4165D2D 9/23/2019 <br /> EL <br /> 7 <br /> CONFLICTS WITH ALL GTH ER UTLLIR ES I ENGINEER: <br /> I <br /> ALL BORESTOBEGINAND I i TIMOTHY BAS <br /> END A MINIMUM OF 10'EITHER I 863-797-766 <br /> SIDEOFPAVEMENT t + <br /> ro 3' 22'R.L. I 1 <br /> j I 27' i COPELAND DR <br /> I <br /> z o <br /> z I <br /> PROPOSED PLACEMENT <br /> WILL EXIT THE RIGHT <br /> I I OF WAY ON TO PRIVATE <br /> I PROPERTY <br /> I <br /> I <br /> I W LOOKING NORTH <br /> ON COPELAND DR I <br /> I <br /> FROM 595'SOUTH PROPOSED PLACEMENT <br /> OF TUCKER ROAD I OF 55'(1)1.25 HDPE <br /> I <br /> SUBDUCTBY <br /> I <br /> DIRECTIONAL BORE <br /> 1 <br /> i <br />