Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R.value) of R-3 shall be applied to the <br /> following: <br /> Piping-4. inch (19.1 mm)and larger in nominal diameter., <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold.. <br /> Piping.located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the energy-cacls shall be with oern:it at all times <br /> 27. Copy of final insulation i etiort-shall be provided with permit before fnaL <br /> 28. No fence, pool or screen enclosure is issued with this.permit <br /> F.F.E;-Finished Floor Elevation <br /> RB.C- Florida Building Code 6ffi Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />