NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions"
<br /> which may be more restrictive than County.regulations. The undersigned assumes responsibility for compliance-with any
<br /> applicable deed restrictions. '
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor- or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations.• if the
<br /> contractor is not-licensed as required bylaw, both the owner and contractor may be cited for a.misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have•the contractor{s) sign
<br /> portions'of the `contractor Block" of this application for which they-will be responsible. •If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation impact Fees and Recourse Recovery Fees:may apply to the construction of new buildings, change of
<br /> use in existing buildings,.or expansion of existing buildings, as specified.in Pasco County Ordinance.number 89-07'and
<br /> 90-07, as-amended.. The undersigned also understands, that such fees, as may be due, will be identified_at the time of
<br /> permitting. it is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate of occupancy"'or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Watbdsewer Impact
<br /> fees are due, they must be paid prior to permit Issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION,LIEN LAW.(Chapter 713, Florida Statutes, as amended): If valuation of work is$2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with•a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTORVOWNER'S AFFIDAVIT: I certify that all the information in this application is.accurate and that all work
<br /> will be done-in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County.and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that i understand that the.regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such.agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands,'Water/Wastewater Treatment.
<br /> Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses-.
<br /> Army-Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks. - •
<br /> - . US Environmental Protection Agency-Asbestos abatement.
<br /> Federal Aviation Authority-Runways.
<br /> i understand that the following restrictions apply to the use of fill:-
<br /> 'Use of fill is not allowed in Flood Zone 11V"unless expressly permitted.
<br /> if the.fill material is to be used in Flood.Zone "A", it is understood that a drainage plan addressing a '
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material is. to be used in Flood Zone "A" in connection with.a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wail.
<br /> If.fill material is to be used in.any area, .I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use.of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the.conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill,an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform-.the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in-the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to,vlolatei cancel, alter,-or
<br /> set aside any provisions.of the technical codes; nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become.invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension
<br /> may be requested,.in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause far the extension. If-work ceases for ninety(90)consecutive days,thEQob is considered.abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A"NOTICE OF COMMENCEMENT MAY-RESULT IN YOUR
<br /> PAYING.TWICE FOR IMPROVEMENTS-TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT
<br /> WITH YOUR'I_ENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDA JURAT(R.S.11.7 3
<br /> OUVNERORi4GEN1''•:.. -..---. - .. -CONTt2AGT0
<br /> Suti'sdfibed-and sworn t (or ' bet a this Subscribed and b or a rmed efore me this
<br /> by y
<br /> Who.is/are personally known tome or has/have produced Who Is/are personally known to me or has/have produced
<br /> as identification. as identification.
<br /> Notary Public — 1' Notary Public
<br /> Commi Commission No.
<br /> Y" P/// ANNA MARIE LYNCH TERRY '
<br /> �/B� ,'7�,11111111/ y,, @�{�pr r��p
<br /> m, �%' �YOTef DIl
<br /> Name of t - u c-state of.Florida
<br /> n s� Fe
<br /> Name o priib� onp F 958064 = ° Commission#FF 958064
<br /> a My Comm.Expires Apr 4,2020 ?9F p�,= My Comm.Expires Apr 4,2020
<br /> Bonded through National Notary Assn. Bonded through National Notary Assn.
<br />
|