Laserfiche WebLink
f <br /> FORM R405-2017 <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br /> Florida Department of Business and Professional Regulation - Residential Performance Method <br /> Project Name: Hayden 2605 El K t Builder Name: DRH Express Homes <br /> Street:-:TN 2-Z Permit Office: CV <br /> City,State,Zip: Zephyrhills, FL, 33. [N n "J Permit Number: 2� `� 7 <br /> Owner: Jurisdiction: / /6�00 <br /> n (A <br /> Design Location: FL,Tampa ( ( _/ County: Pasco(Florida Climate Zone 2) <br /> 1. New construction or existing New(From Plans) 9. Wall Types(2704.0 sgft.) Insulation Area <br /> 2. Single family or multiple family Single-family a.Concrete Block-Int Insul, Exterior R=4.1 2389.10 ftz <br /> b.Frame-Wood,Adjacent R=11.0 314.89 ftz <br /> 3. Number of units,if multiple family 1 c.N/A R= ftz <br /> 4. Number of Bedrooms 5 d.N/A R= ftz <br /> 5. Is this a worst case? No 10.Ceiling Types (1541.0 sgft.) Insulation Area a.Under Attic(Vented) R=30.0 1541.00 ftz <br /> 6. Conditioned floor area above grade(ftz) 2605 b.N/A R= ftz <br /> Conditioned floor area below grade(ftz) 0 c.N/A R= ftz <br /> 11.Ducts R ftz <br /> 7. Windows(251.7 sgft.) Description Area a.Sup:Attic, Ret:2nd Floor,AH:2nd Floor 6 261 <br /> a. U-Factor: Dbl,U=0.34 211.67 ftz <br /> SHGC: SHGC=0.31 <br /> b. U-Factor: Dbl,U=0.55 40.00 ftz 12.Cooling systems kBtu/hr Efficiency <br /> SHGC: SHGC=0.34 a.Central Unit 40.0 SEER:14.00 <br /> c. U-Factor: N/A ftz <br /> SHGC: 13.Heating systems kBtu/hr Efficiency <br /> d. U-Factor: N/A ftz a.Electric Heat Pump 41.0 HSPF:8.20 <br /> SHGC: <br /> Area Weighted Average Overhang Depth: 1.948 ft. <br /> Area Weighted Average SHGC: 0.315 14.Hot water systems <br /> 8. Floor Types (1541.0 sgft.) Insulation Area a.Electric Cap:50 gallonsEF:0.950 <br /> a.Slab-On-Grade Edge Insulation R=0.0 1104.00 ftz b. Conservation features <br /> b.Raised Floor R=19.0 437.00 ftz None <br /> c.N/A R= ftz 15.Credits Pstat <br /> Glass/Floor Area: 0.097 <br /> Total Proposed Modified Loads: 84.92 PASS <br /> Total Baseline Loads: 86.07 <br /> 1 hereby certify that the plans and specifications covered by Review of the plans and O�tE SxgrF <br /> this calculation are in compliance with the Florida Energy specifications covered by this <br /> Code. calculation indicates compliance <br /> with the Florida Energy Code. <br /> PREPARED BY: Before construction is completed <br /> DATE: 2-24-14 this building will be inspected for c�7 T 1V1j1 <br /> compliance with Section 553.908 * �' <br /> I hereby certify that this building, as designed,is in compliance Florida Statutes. <br /> with the Florida Energy Code COD <br /> OWNER/AGENT: BUILDICJAh <br /> DATE: DATE: LL <br /> - Compliance requires certification by the air handler unit manufacturer that the air handier enclosure qualifies as <br /> certified factory-sealed in accordance with R403.3.2.1. <br /> -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an <br /> envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2). <br /> - Compliance with a proposed duct leakage Qn requires a Duct Leakage Test Report confirming duct leakage to outdoors, <br /> tested in accordance with ANSI/RESNET/ICC 380,is not greater than 0.060 Qn for whole house. <br /> 8/26/2019 9:39 AM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 5 <br />