Laserfiche WebLink
21 Tamper-Resistant Receptacles in accordance with 406.11 of-the 2016 N.E.0 <br /> 24. In accordance with the.Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot.water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping v/ inch (19.1 mm)and larger in nominal diameter.: <br /> Piping.serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to.a'distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C;O. <br /> 26.A cony of the enerzy cacls shall be with perynit at all times. <br /> 27. Copy of final insulation report shall be provided with permit before rInA <br /> 28. No fence,pool or screen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />