Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe'with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping�14 inch (19.1 mm) and larger in nominal diameter. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to.a distribution manifold:. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O.: <br /> 26. A copy of the enerzy cacls shall be with permit at all times. <br /> 27. Cony of final.insulation-report shall be provided with vein:it before fnal <br /> 28. No fence, pool or screen enclosure .is issued with This-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) - <br />