My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22112
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:50:02 AM
Creation date
2/17/2021 9:57:32 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-22112
Building Department - Name
ANDERSON,JAMES E & LINDA
Address
36212 SHADY BLUFF LP LOT 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 6 <br /> ROCK-IT SY STeM 4.0 in-STALL <br /> s, <br /> F — <br /> r <br /> .Y <br /> w�Y <br /> Fig.A <br /> Install EcoFasten Solar Flashing with Rock-It Mounts <br /> •Follow EcOFastensolarkutatilnstrvcttonsforflashing and brackethntall(6rcenFasten shown above).' <br /> •Optimum vertloldistance betweenlag bolts is131V plus module dimension. <br /> .:Set mounts on eave most row so that the Rode-It Pedestal is on the South end of Rock4t Slide. <br /> .Set <br /> •Set mounts on all upper rows so thatthe Rock wit Pedestal is on the North end of Rodcdt Slide. <br /> Z- Install Rock-It Array Skirt onto_Eave Mounts <br /> •Slide Rock-it Array Skirt Into front channel on Rock-It Shelf, <br /> -.Array Skirt End,Caps are pre-installed on the fast end of each skirt section,and are-used to couple.the skirt sections where needed(see Flg A) <br /> Tighten Mld-Clamp bolt,clamping Rock-It Array Skirt to mount.Torque to 200ln4bs.(1301n4bs.when Installing with 32mm modules). <br /> 3.4 Install Rock-It Couplings(when joining 4 panels with a Coupllrig,the use of a load bearingfoot is required) <br /> •Prior to mounting on the roof,snap Load Bearing Foot Into the bottom of.Rock-It Coupling if required.. <br /> (Each Load Bearing Foot Is set to same height as the Rock-it Mounts-adjust accordingly) <br /> •.On.eave row only,slide Rock-It Array Skirt onto Rockat Coupling Shelf.Torque to specified value. <br /> • NOTE:If a coupling lands on a rafter,the Hyb'rid'Mount1 should be used in place oftheRock-It Coupling(refer to Image.3a). <br /> -Hybrid Mount can be made in the fleld.by assembling a coupling to a mount pedestal;or by purchasing separately. <br /> C, Align and Straighten*First Row of.the Rock-it System with Rock-It Array Skirt <br /> •Use North-South adjustment ofthe Rock-R Pedestal to straighten Rock4t Array Skirt and align module with ArraySkirL <br /> •Torque screw on side of Rock-It Pedestal to150In-Ibsto secure itto the Rock-ItSilde. <br /> -Adjust Flange Level Nut totevel the system(optional—can be leveled doringorafterinstallation). <br /> 6�, Install 1'st Row of PV Modules <br /> —9- Slide upslopeRodo-R Mounts down to engage top offirstmodule. <br /> •install Rock it[oupiingson the upslope side of Ist row ofpanels. <br /> •Torque 2nd row of Mid-Clamps on Rock-It Mounts and Rock It Couplings to specified value. <br /> •Install balance ofPV modulesensudng that the RodM Pedestals are In the appropriate position,then torque Mld-Clamps to secure modules: <br /> 1-0 Level the Rock-it System <br /> when assembiyls complete;levetthe entire system by adjusting.Flange Level Nuts(Flange Level Nuts have no torque value): <br /> • Height between mofsurface and underside of modules should be 3'or less,when Installed with Type-2 modules <br /> INSTALLATION NOTE:Modules should be instal led so thatthe junction.box Is installed upslope,away.from the leading edge of the array. <br /> www.ecofastensolarcom info@ecofastensoiarcom 877-859-3947 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.