Laserfiche WebLink
THermaL EXPansion anD BonDInG <br /> A thermal expansion gap is required per <br /> each continuous 40'length of modules. -- Bond Patn <br /> ® Grounding lug <br /> Omit a coupling and leave a 2°gap in <br /> the Rock-It Array Skirt and also between �cnductor�GL1,- rg <br /> the modules at that point. gEroundral'Y`°�"'� <br /> Roek•lt Coupling <br /> ® Rock-It Mount <br /> —Rock-it Array Skirt <br /> BracKeT sPacinG <br /> Portrait Orientation Landscape Orientation <br /> i <br /> Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"0C. <br /> 32mm modules:Max east/west bracket spacing.is 48°0C. <br /> Spacing may vary depending upon project specific structural requirements;i.e.high snow and wind load <br /> areas may require lesser spacing E-W than the maximum. <br /> ! sTaGGereD LaYOUT canTlLever anD oFFseT <br /> Staggered Mounting Points <br /> Cantilever: Maximum cantilever is 1/3 bracketspacing. For ortrait <br /> R-Rack-ItMount ®Rock-It Coupling orientation installations,check layout prior to installin . p <br /> The array layout instructions in this installation manual offer a <br /> general overview of layout. Periodically,.dueto a variety of Offset:Offset from all roof edges depends on wind speed,snow <br /> factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location <br /> www.ecofastensolarcom info@ecofastensolar.com 877-859-3947 14 <br />