Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit.maybe subject to"deed"restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibilltyfor compliance.with any <br /> applicable deed.restrictions. <br /> UNLICENSED CONTRACTORS'AND.CONTRACTOR RESPONSIBILITIES: If'the owner has hired"a contractor or <br /> contractors to undertake work, they-may be required to be licensed in:accordance with.state-and local regulations; If the <br /> contractor is not licensed as required by law, both the owner and contractor.may be cited for a misdemeanor violation <br /> under-state-law., If the owner or intended.contractor are.uncertain as.to what licensing-requirements may apply for the <br /> intended work, they are advised to contact-the Pasco County Building,Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner-has hired at-contractor or contractors, he is.advised.to have the contractor(s) sign <br /> portions-of-the-the "contractor Block" of.-this application.for which-they will-be responsible.. If-you, as the.owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled.to-permitting-privileges in Pasco <br /> County. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERYFEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fees.may apply to the..construction of new buildings, change of <br /> use in existing.buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned-also understands,'that such fees;-as may be due;-will be-identified at the timedf <br /> permitting. It is further understood that Transportation Impact.Fees and-Resource Recovery-Fees must be paid.prior to <br /> receiving a "certificate of occupancy" or final power,release. If the projqct-does=,not involve acertificate of=cupa'ncy or, <br /> final power release, the fees must be paid prior to permit issuance. 'Furthermore, if'Pasco County WcIter/Sewer Impact <br /> fees.are due,they.must be.paid.prior to permit issuance in accordance with.applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 713;,Florida Sttitutes,.-asamended): If valuation of work is,$2.,5.00.00;or!more,.F <br /> certify that--1,-the applicant, have been provided--with a copy of-the, "Florida--,-Construction Lien Law—Homeowner's <br /> Protection Guide" prepared by the Florida Department of Agriculture:and:Consumer Affairs. If the apolicantjs;;someone <br /> other than the"owner";I certify-thatl have obtained a copy,of the above described document and,promise-in good faith to <br /> deliver it to the"owner"prior to commencement. , i . i '. , : <br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I.certify that all,the information in.this.application is.accurate and that,all work <br /> will•be done-in compliance with all-applicable laws regulating construction;zoning and land development. Application.is <br /> hereby made to obtain a permit to do' Work and'installation- as indicated. I certify that no work or installation has <br /> commenced prior.to issuance of a permit and that all work will be performed-to rheet.standards of all laws.regulating <br /> construction, County and City-codes, zoning-regulations, and 'land development regulations. in the jurisdiction. I-also <br /> certify,that I understand that the regulations of othergovernment�agencies may-apply to�the-intended work, and that it is <br /> my-responsibility to identify what actions I must take.to',-beincompliance. Such agencies-Include:but are not1imited to: <br /> - Department of Environmental Protection-Cypress Bayheads, Wetland.Areas-and.Environmentally Sensitive <br /> -Lands,Water/Wastewater Treatment. <br /> - 'Southwest Florida Water Management District-Wells, Cypress 'Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls, Docks,-Navigable Waterways. <br /> Department of Health Re'habilitative;,Services/EhvironmentaI Health Unit-Wells,-Wastewater Treatment; <br /> - & ' <br /> Septic Tanks. <br /> US Environmental-Protection.Agency­Asbestos abatement. <br /> Federal Aviation Authority-Runways. <br /> I understand.thatthe-following-restrictions apply.to-the;use.of-fill: <br /> Use of.fill is not'allowed in.Flood2one-V"utiless'-,expressly.permifted. <br /> If the fill material, Js -to.be used in Flood Zone "A", it is understood that a drainage plan address <br /> ing a <br /> "compensating volume" will'bei.submitt6d at time of,permitting,which is-.prqpared-by a professional-engineer <br /> licensed by the State of Florida. <br /> If the:fill-material is to.be.used-in,Flood Zone'"A"-in connection with a permitted building. using stem``Wall <br /> - . - <br /> construction,,I certify that fill-will-be,used-only-to fill the,area-within-the.stem.wall. <br /> If fill material is to be used in any area, I -certify•that use of such fill will not adversely affect adjacent <br /> properties.,.If use.offill isJound to.adversely affect adjacent-properties;.the.-:owner-may be,cited for violating <br /> the conditions of the building permit issued under the-attached permit application, for lots less than one (1) <br /> acre which are elevated,by fill, amengineered drainage plan is required. <br /> If I am-the-AGENT.FOR.-THE-OWNER, I promise in good faith to in-form_the owner of the-permitting:conditions set forth in <br /> this affidavit.prior to commencing construction. I understand that a separate permit may be required for electrical work, <br /> plumbing,--signs,,wells,-pools, air-conditioning,.gas, or other installations not,specifically-included in..the-application. A <br /> permit issued shall be construed to be a license to,proceed.with the work and not as authority to violate, cancel,.alter, or <br /> set aside any provisions of the:'technical cod ds.,'nor,shall Issuance of.a permit prevent the Building Official from thereafter <br /> requiring•a-correction of-errors--in plans, construction or violations,of any codes. Every permit--issued shall,become <br /> come invalid <br /> unless the work authorized by such-permit is commenced within six months of permit issuance, or if.work authorized-by <br /> the.peirmit is suspended r or abandoned for a period of'six(6)months after the time the.work is'dommenced i' An extension <br /> may,be requested,Jn writing,,from,the Building Official fora period not to exceed ninety(90)days and will demonstrate <br /> justifiable cause.for the.extension: If work ceases for ninety(90)-consecutive days,the.job.is considered.abandoned., - <br /> WARNING:TO-OWNER: YOUR''FAILURE TO.-RECORD:A-.NOTICE.�OF, COMMENCEMENT,..MAY-RESULT-,IN YOUR <br /> PAYING TWICEFOR iIMPROVEMENTS`TO'YO-UR�PROPERTY: IF:YOU-1NTEND*TO:,OBTAIK FINANCING;'CONSULT <br /> WITHiYOUR,LENDER-OR:AN--A-T,TORNEY,-BEFOO.E-,,'-RECORDINGYOUR'NOT,ICE.-OF COMMENCEMENT. <br /> FLORIDA JURAT <br /> 0F 5;1 <br /> OWNEWORAGENT— -CONTRACTOR'­ <br /> Subscribed•and sworn to(or affirmed)before me,this Subscribed and'swom to(or affirmed),before me this <br /> by by <br /> Who Ware personally known IQ me or has/have produced Who is/are personally known tome'or has/have produced, <br /> as Identification, as identification. <br /> —Notary Public Notary Public <br /> Commission No. Commission No. <br /> Name of Notary typed,printed or stamped Name of Notary Wed,printed-or stamped <br />