Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at-least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> insulation for hot water pipe with a minimum_ thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31, inch (19.1 mm)and larger in nominal diameter.. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold. <br /> Piping located under'a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O. <br /> 26.A copy of the enemy cacls shaft be.with permit at all times. <br /> 27.. Copt/of Thal insulation Yetiort shall be provided with permit before rinal <br /> 28. No fence,pool onscreen enclosure is issued with this-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />