Laserfiche WebLink
l <br /> ERICAN <br /> EXPRES <br /> visa <br /> Ryman Roofing Inc. <br /> 5%fee for credit card processing. <br /> ADivision ofRyman Construction,Inc. <br /> 36413 SR 54 Zephyrhills, Florida 33541 Proposal# <br /> `��\ Phone(813)782-6094 - Fax(813)788-6773 No. 0012040 <br /> 1-855 Go Ryman (1 855-467-9626) • Lie.#CCC 1325505 Estimate# <br /> 0 www.RymanRoofing.com <br /> Q` Serving all of Central Florida Job# g <br /> Owner/Purchaser Robert Maxon or Cheryl Maxon - Date: 12/6/19 - <br /> Claim#: InsuranceCompany: <br /> Policy# <br /> Job Address: 5310 17th St City. Zephyrhills Zip: , 33542 <br /> Mail to Address: E-Mail Address: Jomaxauto1 @frontuer.co� <br /> Home #: 813-469-8747 Cell #: 813-417-6274 Business #: <br /> 0 Complete tear off of existing Asphalt shingles Additional Notes/Special Concerns: Includes <br /> One layer included Install new lifetime Ltd. dimensional shingles <br /> 0 Secure all loose roof decking as needed according <br /> to Florida Building Codes <br /> ❑✓ Roof dried in with Synthetic <br /> Rhino roof synthetic underlayment <br /> 0 Install new valley metal with galvanized metal <br /> 0 Install new 6 "drip edge color. Resisto peel and stick in valleys <br /> 11 Install new lead boots <br /> 0 Install all new general roof vents <br /> 0 Install new WlShingle ❑Metal ❑Tile <br /> Modified Butimen ❑TPO <br /> 0 Manufacturer (shingle, metal or tile) GAF Two sheets of plywood included <br /> Manufacturer (TPo or Mod. Bitumen) <br /> �✓ Color:(Shingle,MetalorTile) Permit and scheduling of inspections <br /> Color:(TPOorMOD.Bitumen) <br /> 0✓ All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet <br /> �✓ All materials,labor and permits furnished Base Price=$ 57 641'.00 <br /> n Provide 5 year labor warranty <br /> Additional Items: <br /> Payment Method: Check# Cash Financing Insurance Claim <br /> ❑ Credit Card# / Exp.Date CC ID# <br /> Down Payment:$ / �L-A� Amount Financed:$ Approx.Monthly Payment: $ <br /> PaymentTerms: 35%down and balance upon completion <br /> Extras: <br /> *B se Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"above. customerinufal <br /> Deficient 1/2"plywood replaced at a cost of$65.00 per sheet in the roof field,which includes labor&materials.All other wood work/ad- <br /> ditional labor,such as, but not limited to,valley rebuilding, rafter replacement, 1x decking,etc.will be a rate of$5.00 per lineal foot plus the <br /> cost of materials. <br /> THIS BECOMES A BINDING CONTRACT UPON ACCEPTANCE OF PROPOSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> ACCEPT THIS PROPOSAL MD HER Y ERTIFY THAT I HAVE READ AND FULLY UNDERSTAND THE PROVISIONS OF THIS CONTRACT. <br /> Purchaser: Date: 12/6/19 <br /> Purchaser: Estimator. Ed <br />