My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22170
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:52:58 AM
Creation date
2/17/2021 10:44:10 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-22170
Building Department - Name
GONZALEZ,AUSTIN SCOTT & SCARLET
Address
6694 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPORTANT SAFETY INSTRUCTIONS <br /> INSTRUCTIONSREAD ALL - PRIOR TO INSTALLATION <br /> NOTE: SAVE THESE INSTRUCTIONS <br /> This manual contains important instructions that shall be followed during installation and maintenance of the <br /> Soltection RJ-1 rooftop junction box with flashing. <br /> 1ALETHAL VOLTAGES ARE PRESENT DURING THE INSTALLATION, OPERATION AND SERVICE OF THIS EQUIPMENT. <br /> PROPER PRECAUTIONS MUST BETAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . <br /> SAFETY WARNINGS & CAUTIONS <br /> ■ Only qualified personnel or licensed electricians should install this product and the instructions herein are <br /> provided for those individual(s)only. <br /> ■ To reduce the risk of electric shock, injury, or death, all electrical wiring and connections must be <br /> performed by qualified personnel. <br /> ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper <br /> precautions must be taken at all times to ensure the safety of the service personnel. <br /> ■ Follow state and federal Occupational Safety and Health Administration (OSHA) guidelines and <br /> regulations when installing this product. <br /> ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations as well <br /> as for installation best practices. <br /> ■ Install this apparatus in accordance with ANSI/NFPA 70, National Electrical Code (NEC). Follow all <br /> national or local electrical codes. <br /> ■ Install, operate, and use this product in a manner consistent with the instructions provided. Failure to <br /> follow the procedures indicated may result in roof leaks, property damage, or consequential damage. <br /> www.soltection.com Soltection RJ-1 Installation Manual Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.