Laserfiche WebLink
PLYWOOB FLOORING 2x4 RASEPLATE <br /> FLOOR JOIST 2x4t6)PT RIM JOIST FLOOR MST GENERAL NOTES <br /> 2'x2'xl/8'ZINC PLATED WASHER 3/4'PLYWOOD FLOORING <br /> v2•X4'GALV LAG BOLT 1.BUILDING ANCHORS INTO EARTH SHALL BE <br /> 2xa HASEPLATE ANCHORS BY BYE TYPE 1/2'HEI E PRIDE OR EQUALLWITH E n <br /> ANCHOR ATTACHED TO BUILDING MINIMUM EMBEDMENT I3F 24'AND <br /> WITH i/ex4'GALV LAG BOLT 4t63 PT RIM JOIST AVERAGE WILDING POWER OF 4,0000 <br /> EYE OF <br /> ANCHOR. W7 R 131STL 2. BUILDING ANCHORS INTO CONCRETE 1/2' <br /> INTO END OF FLOOR JUST 21.2'x1/8'ZINC- WEDGE ANCHORS WITH MIN 3'EMBEDMENT <br /> GRADE PLATED WASHER 3.ANCHORING SYSTEM TO GROUND PER LOCAL <br /> o BUILDING CODE.LOCATE ANCHORS PER <br /> t/2'X4'GALV LAG BOLT SPACING REQUIREMENTS SHOWN WITHIN <br /> 4,ANCHORING SYSTEM TO CONCRETE SLAB PER c <br /> PIER SPACING LOCAL BUILDING CODE.LOCATE ANCHORS PER <br /> REQUIREMENTS SAME SPACING REQUIREMENTS SHOWN WITHIN a <br /> AS ANCHOR SPACING � 112'EYE AUGER ANCHOR WITH ANCHOR ATTACHED TO BUILDING 5.END PAD SPACING IS END OF BUILDING TO <br /> REQUIREF4ENTS = 4'SINGLE HELIX&Milt WITH 1/2'x4'GALV LAG BOLT CENTER OF END PAD n <br /> ENHEA NT OF 24'.FLI:ATE THROUGH VASTER,THEN EYE OF 6.PAD SPACING OTER THAN END PADS IS n <br /> AMCHRRS ONLY At.ON LO NG ANCHOR,THEN R/N JOIST L CENTER TO CENTER o. <br /> SIDE OF BUILDING END ANCHORS INTO END OF FLOOR JOIST a <br /> WITHIN 2'OF EACH END,THEN 7 CONCRE E BLOCK (CEMENT AND SAND MIX) <br /> e'MAX."SPACING. GRADE 8,HOLLOW OR SOLID CONCRETE BLOCKS MAY <br /> BE DRY-STACKED ON PADS FOR HIGH SETS t <br /> I/2'EYE AUGER ANCHOR WITH UP TO 48' WITHOUT REINFORCING <br /> SHED WITH ATTACHED SKIDS 9.ANCHOR SPACING IS BASED ON ASCE 7-10 E <br /> END VIEW 4'SINGLE HELIX 6 MIN RISK CATEGORY I BUILDING EXPOSURE B <br /> EMBE T OF V.LOCATE L) 'u n <br /> z AN EM NLY ALONG LONG 160 M.P.H. t3 SEC GUST)EXPOSURE C <br /> SIDE OF BULLDING END ANCHORS 2017 FLORIDA BUILDING CODE 6#h EDITION <br /> SCALE,MY.& WITHIN 2'OF EACH END.THEN 10.MAXIMUM INTERIOR SIDEVALL HEIGHT OF ~�^•�'+ <br /> N 8'MAX ANCHOR SPACING. BUILDING IS 8'0' INSIDE WALL HEIGHT a gal <br /> NIL 11.MAXIMUM WIDTH OF FLOOR IS 13'10'WI➢E q NON o <br /> 12.MAXIMUM LENGTH OF FLOOR IS 50'LONG y ui vi 1 <br /> 13.PIER SPACING REQUIREMENTS SAME AS }� <br /> AUGER ANCHOR SPACING REQUIREMENTS <br /> ANCHOR ATTACHMENT DETAIL nn <br /> i O W <br /> SCALF,NT.S. <br /> FOUNDATION ANCHORING TIE DOWN SYSTEM CODE REVIlf w <br /> 2x4 DASEP SU 1/2'ZINC PLATED NUT TO BE SITE DESIGNED AND LOCALLY ^'�+•_�^°' ;< ",-�..^' <br /> cn z x2 xt/8'ZINC PLATED WASHER PERMITTED <br /> 3/4'PLYW® <br /> 26 EL 15 G-90 GALV itxvheh�n.ii<I.xt[LLt� .,.may <br /> 2x4t6)PT RIM J01S7 STEEL ED B x BRACKET <br /> t/2'WEDGE ANCHOR WITH U-SWIPED BRACKET 1(la101e4o <br /> 1/2'x 12'EYEBOLT 3'MIN EMBEDMENT INTO ATTACHED TO � <br /> EACH Miso .umm <br /> SOLID CONCRETE SLAB STUD 6 FASTENED V/ Ua gua Aw <br /> EYE BOLT ATTACHCB TO ANCHOR VITH THROUGH 2x4 WALLPLATE IN INC. <br /> G 2x4 PT MTM14 PLATE RING SHANK <br /> x 125' ExpxmvpObat+�:)xanxGfRwWf4 ��i A SY. <br /> to 3/21x21 ZP ffiLt,(2)2•x2'x!/8` RING SWANK GALV NAILS alcas�tucg+cnu YQ S. 436 <br /> SPACING➢F ANCHORS TO <br /> ZP VASTER,t13 1/2'ZP NUT BE 14AX 3'ALBNG ALL x4 BASEPLATE +�� 9f2 SZ6-3266 <br /> T 51: r5t.:,, A-24 S09UN for EQUAL) FOUR WALLS WITH 1 <br /> NW I' �'-.'•;y'> z AN WITHIN 1'OF 1111111/f <br /> L �; ".s..i; 870X UPLIFT WITH 1/2'WEDGE <br /> ANCHOR MIN 3'EMBEDMENT. EACH CORNER. 2'x4'P.T.BASE ''(k1 <br /> CONCRETE SLAB BY LOCATE ANCHORS aNLY ALONG ----CONCRETE SLAB BY <br /> M <br /> LONG SIDE BF HU L,DING,END T 4-�. _ '-., <br /> DTNffRS LOCAL.CODE ANCHURS WITHIN 2'QF EACH MIN A' OTHERS LOCAL CODE <br /> AN➢JURI5DICTION END.THEN 3'MAX SPACING y - '" AND JURISDICTION �'C'; % TIE DOWN DETALS <br /> APPLY APPLY <br /> OIBf <br /> SHED WITH ATTACHED SKIDS SHED WITHOUT FLOOR 6DTlE� <br /> ANCHORED TO CONCRETE ANCHORED TO CONCRETE %ass' °'" ' TCIE DAWN '- <br /> END VIEW END VIEW 111 +++` iz so t7 a of B <br /> AS NOTED <br /> SCALE,KtS. SCALE.NTJL <br /> PSI APPROVAL 20tB-0l-lS <br />