Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Laud Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> insulation-for'hot water pipe with a minimum thermal resistance (R-value)of R-3 shall be applied to the <br /> following: <br /> Piping 31.inch (19.1 mm) and larger in nominal diameter., <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping'from the:water heater to a distribution manifold:. <br /> Piping.located under,a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation-systems other than demand recirculation systems. <br /> 25. Blower door test shall be proviided before C.O. <br /> 26. A cony of the energy cacls shall be with permit at all times. <br /> 27. Cony of final insulation report shall be provided with permit before final <br /> 28:No fence, pool or screen enclosure :is issued with:this-permit.: <br /> RRE.-Finished Floor Elevation <br /> F.B.C--Florida Building Code 6a'Edition <br /> R.O.W:-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />