Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11.of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot.wate.r pipe insulation <br /> Insulation for hot water pipe with"a minimum thermal resistance(R-value) of Rm3 shall be applied to the <br /> following: <br /> Piping V. inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from the water heater to,a distribution manifold._ <br /> Piping.located under a floor slab.. <br /> Buried in piping, <br /> Supply and return piping in.recirculation systems other than demand recirculation systems. <br /> 25:Blower door test shall be provided before C.O: <br /> 26.A cony of the energy cacls-shall be with permit at all times <br /> 27. Copy of rnal insulation Yeport shall be provided with permit before final <br /> 28.-No fence,-pool or enclosure-:is issued withlhis-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />