NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regtl lations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES:. If the owner has hired a,contractor or
<br /> contractor`s to undertake work, they may be required to be licensed in accordance with state and-local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited,for a misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements'may-apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block" of this applic tion for which they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is knot properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse kecovery Fees may apply to the construction of new buildings, change of
<br /> use in existing.buildings,.or expansion•of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersioned also understands, that such fees, as'may be due, will be identified at the time of
<br /> permitting. It is further understood that,Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid'prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Flo ida Statutes, as amended): If valuation of work is $2,500.00 or more, I
<br /> certify that I, the applicant, have been provid d with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture.and Consumer Affairs. .If the applicant is someone
<br /> other than the "owner", I certify that I have obtained a copy of the above described document and-promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work apd installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment
<br /> - Southwest Florida Water Management District-Wells, Cypress, .Bayheads,, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> US Environmental Protection Agency Asbestos abatement.
<br /> Federal Aviation Authority-Runways. I
<br /> I understand that the following restrictions apply to the use of fill:
<br /> Use of fill is not allowed in Flood Zone W"unless expressly permitted.
<br /> If the fill material is to be used in (Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be us6d only to fill the area within the stem wall.
<br /> If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas,, or other installations not specifically included in the application. A
<br /> permit issued shallbe construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the-Building Official from thereafter
<br /> requiring a correction*of errors in plans, construction or violations of any codes. Every permit issued shall become invalid
<br /> unless tlie'work authorized.by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDA JURAT(F.S. 117.03)
<br /> OWNER OR AGENT _ __C-ONTRACTOR4- - _ _ - -
<br /> —�u scribed and sworn"to(or atfnned)before me this I Subscribed and sworrygo(or affirm d)before m
<br /> Who is/are personally known to me or has/have produced Who is/ re person known to a or has/have produced
<br /> as identification. (i as identification.
<br /> Notary Public Notary Public
<br /> Commission No. Commission No.
<br /> t1 ov,
<br /> Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped
<br /> CARLOS MALDONADO
<br /> Commission#GG 346275
<br /> .a Expires June 18,2023
<br /> F°F FIt°P Bonded Thru Troy Fain Insurance 800.385-7019
<br />
|