My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22010
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:59:44 AM
Creation date
2/17/2021 11:07:32 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
19-22010
Building Department - Name
BECERRA SR,MARIO & EDNA
Address
6411 LARUELWOOD DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s [ <br /> ROCK-IT S9 STeM 4.0 jnSTaLL <br /> i <br /> Fig.A <br /> Install ECOFasten Soiar Hashing with Rock-it.Mounts <br /> •FoilowEwFanensolarinstallin*ucuomforflwtdngandbrackettrotall(Ureenfastanshownabow). <br /> •Optimum vertical distance between lag bolts Is13/8'pfus module dimenslom <br /> •Setmountsoneavemostrowsothat the Rock4t Pedestal IsontheSouthendofRock4t5ikie.' <br /> •Set mounts on all upper rows so that the Rodr:lt Pedestal is on the North end of Rock4t Slide. <br /> Z Instali Rock-it Array Skirt onto Eave Mounts <br /> • Slide Rock-It Array Skirt Into front channel on Rock-It shelf. <br /> -.Array Skirt End.Caps are pre-installed on the East end of each skirt'section,and are used to'couple.the skirt sections where needed(see Fig.A). <br /> •Tighten Mid-Clamp bolt,clamping Rock-lt Array Skirt to mount.Torque to 200 in-Ibs.(1301n-Ibs when Installing wlth 32mm modules). <br /> �� install Rock-It Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot is required) <br /> ' Prior to mounting on the roof,snap Load Bearing Foot Into the bottom of.Rodc-it Coupling If required.. <br /> (Each Load Bearing Foot Is set to same height as the Roth-It Mounts,adjust accordingly) <br /> -On.eaverow.only,slide Rock4t Array Skirt onto Rock-it Coupling Shelf.Torque tospecified value. <br /> • NOTE:If a coupling lands on a.rafter,the Hybrid Mounts should be used in place of the Rock-It Coupling(refer to irirage3a); <br /> *Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal,or by purchasing separately. <br /> 5 Align and Straighten rFirst Row of.the Rock-It System with Rock-It Array.Skirt <br /> -Use North-South adjustment of the Rock-tt Pedestal to straighten Rodr-It Array skirt and align module with Afray$idrt <br /> -Torque screw on side of Rock-it Pedestal to 150 in-Ibstosecure it to the Rock-t Slide. <br /> •Adjust Range Level Nut to level the system(optional—can be leveled during or afterinstallatton). <br /> 6: install 1 st Row of pV Modules. <br /> Slide upslope Rock-It Mounts down to engage top of first module. <br /> •Install RockltCoupiingson the upstopesideoflst raw ofpanels. <br /> •Torque 2nd raw ofMWaampsonRock-It Mounts and Rock-It Couplings to specified value. <br /> •instaiibalanceofPVrnodules,ensuringthattheRods-ItPedestalsareIntheappropriate,position,then torque Mid-Clamps to secure modules,. <br /> 10 Level the.Rock-It System <br /> •When assembly Is complete,level the entire system by adjusting Flange Level Nuts(Flange Level Nuts have no torque value). <br /> • Height between roof surface and underside of modules should be 3'or less,when Installed with Type 2 modules <br /> INSTALLATION NOTE:Modules should.be installed so that the Junction box Is installed upslope,away.from the leading edge of the array. <br /> wwwecofastensolarcom info@ecofastensolarcom 877=85.9-3947 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.