Laserfiche WebLink
THermaL Expansion. anD BonDInG <br /> A thermal expansion gap is required per <br /> each continuous 401 length,of modules. -- Bond Path <br /> Omit a coupling and leave a T gap in ID Grounding Lug <br /> the Rock-It Array Skirt and also between /---Gcnducto�(ECQ-�r~R <br /> the modules at that point. Vou d'r"�"� <br /> m Rock-It Coupling <br /> ® Rock-It Mount <br /> —Rock-It Array Skirt <br /> BracKeT sPacinG <br /> Portrait Orientation Landscape Orientation <br /> I <br /> j I <br /> Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. <br /> 32mm modules:Max east/west bracket spacing is 48"OC- <br /> Spacing may vary depending upon project specific structural requirements;i.e.high snow and wind load <br /> areas may.require lesser spacing E-W than the maximum. <br /> sTaGGereD .LaY ouT canTlLever anD oFFSeT <br /> Staggered Mounting.Points <br /> ,Rack-It Mount ®Rock-It Coupling Cantilever: Maximum cantilever Is 1/3 bracket spacing. For portrait <br /> orientation installations,check layout prior to installing. <br /> The array layout instructions in this Installation manual offer a <br /> general overview of layout. Periodically,due to a variety of Offset:Offset from all roof edges depends on wind speed,snow <br /> factors(roof obstacles,shading,etc,)other layouts are required. loads,local fire and building codes per location <br /> www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 <br />