My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22013
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 11:01:53 AM
Creation date
2/17/2021 11:09:51 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-22013
Building Department - Name
CUELLAR,EDUARDO & RODRIGO
Address
6720 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2of2 <br /> D. Solar Panel Anchorage <br /> 1. Installation shall proceed in accordance with the applicable guidelines and recommendations indicated below. <br /> If, during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office <br /> should be notified before proceeding with the installation. <br /> • EcoFasten Solar Installation Manual, which can be found on the EcoFasten Solar website <br /> (www.ecofastensolar.com). <br /> 2. The solar panels are 1'/z" thick. At no time will the panels be mounted higher than 10" above the existing <br /> surface of the roof. <br /> 3. The following mounting types shall be used. Please refer to the mounting details for the associated required <br /> penetration depth. Based on our evaluation, the pullout demand is less than the maximum allowable per <br /> connection and therefore is adequate. <br /> • EcoFasten with Rock-It: (1) 5/16" lag screw. Pullout capacity based on National Design Specifications <br /> (NDS)of timber construction specifications for Southern Pine is 235 Ibs/inch penetration. <br /> 4. Fasteners are installed to meet industry standards and this document satisfies requirements in 2017 FBC <br /> 2303.4.5 verifying that the fasteners will not adversely affect the roof framing. <br /> 5. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph B above, using the wind <br /> load uplift procedures of ASCE 7-10 and is specified below. These spacing requirements apply to all mount <br /> types indicated above. The following values have been verified by in-house testing and the mounting hardware <br /> manufacturers'data, which are available upon request. Panel support connections should be staggered,where <br /> possible,to distribute load to adjacent members. <br /> Modules in Landscape Modules in Portrait <br /> Roof Zone Interior Ede Corner Interior Ede Corner <br /> Max Vertical Spacing in 40 40 40 66 66 66 <br /> Max Horizontal Spacing in 48 48 48 48 48 48 <br /> Max Uplift Load Ibs 369 236 132 623 398 222 <br /> E. Summary <br /> Based on the above evaluation,with the structural repairs completed as prescribed and appropriate panel anchors <br /> being utilized,the roof system designed on will adequately support the additional loading imposed by the solar <br /> panels, if installed correctly. This evaluation has been performed for the structural elements only and verifies that <br /> they are in conformance with the 2017 Florida Building Code-Residential 6th Edition, current industry standards <br /> and practice, and the information supplied to us at the time of this report. <br /> If there are any questions regarding the above, or if more information is required, please contact me. <br /> �,�w I IIIIil/i l <br /> Regards, \�� �,. <br /> J. Matthew Walsh, PE = * N 84 <br /> y <br /> FL License No. 84923 <br /> STATE OF <br /> S 0 N, <br /> NAL <br /> 10/14/2019 <br /> vivi it• <br />
The URL can be used to link to this page
Your browser does not support the video tag.