Laserfiche WebLink
ACP SCHEDULE OF VALUE QUANTITES <br /> PROJECT: The Oaks at Pasco <br /> DATE: 3/24/18 <br /> WALL# Wall Length Square Footage Cost(Excludes Engineering) <br /> RW-1 232 LF 705 SF $12,231.73 <br /> RW-2 752 LF 3311 SF $57,445.76 <br /> RW-3 160 LF 353 SF $6,124.54 <br /> RW-4 732 LF 1789 SF $31,039.10 <br /> RW-5 321 LF 572 SF $9,924.18 <br /> RW-6 163 LF 602 SF $10,444.68 <br /> RW-7 0 LF 0 SF $0.00 <br /> RW-8 0 LF 0 SF $0.00 <br /> RW-9 0 LF 0 SF $0.00 <br /> RW-10 0 LF 0 SF $0.00 <br /> RW-11 0 LF 0 SF $0.00 <br /> RW-12 0 LF 0 SF $0.00 <br /> RW-13 0 LF 0 SF $0.00 <br /> RW-14 0 LF 0 SF $0.00 <br /> RW-15 0 LF 0 SF $0.00 <br /> RW-16 0 LF 0 SF $0.00 <br /> RW-17 0 LF 0 SF $0.00 <br /> RW-18 0 LF 0 SF $0.00 <br /> RW-19 0 LF 0 SF $0.00 <br /> RW-20 0 LF 0 SF $0.00 <br /> RW-21 0 LF 0 SF $0.00 <br /> RW-22 0 LF 0 SF $0.00 <br /> RW-23 0 LF 0 SF $0.00 <br /> RW-24 0 LF 0 SF $0.00 <br /> RW-25 0 LF 0 SF $0.00 <br /> Wall Total: 2360 LF 7332 SF - <br /> Engineering Cost (Billed Up-Front) $6.00 <br /> Wall Cost (Excludes Engineering Cost) $127,210.00 <br /> Fence Cost (if Applicable) $0.00 <br /> Total Project Price (Engineering+Walls) $127,210.00 . <br />