Laserfiche WebLink
NOTE Sheet Metal Screws must penetrate a <br /> fnh of 3 fteods through at least 2 sheets,of <br /> % <br /> metal(mointch o min.Ur edge distance). -05 <br /> C tall <br /> INTERIOR 3 <br /> z <br /> S <br /> sok <br /> 13 7 <br /> G2 :;'R <br /> 3 it <br /> 2"\ <br /> 4 if r <br /> 3ms <br /> E <br /> f T <br /> L B <br /> 3 0. <br /> 1 2 C <br /> Hotel. 3 EXTERIOR 17 SEENOTE3 <br /> 1.Lock and keeper located 7'fronn 4, <br /> each end of lock/meeting stfle. 4 YORIZONTAL CROSS SECTION <br /> \,�Metal Stud Construction <br /> Metal roller assernbly located 7from, <br /> each end of the bottom ral. G1 <br /> 3.Ant"It secured to head with F 0 <br /> (6)#6 x 112"FIPH SMS. ALTERNATE ANCHORING LOCATION E <br /> SHOWN ON THIS SHEET EXTERIOR <br /> 3 INTERIOR <br /> WN. G2 <br /> EMIT.(TYP.) A • 4 7 <br /> 3 8 C INTERIOR 3 INTERIOR C 2 15 <br /> 8 <br /> 13 Is <br /> 13 10 G2 G2 <br /> 7 z <br /> SEE NOTE I D 14 SEENOTE2 0 <br /> 12 <br /> 16 <br /> B <br /> U <br /> 3 <br /> z <br /> 6 6z 00 <br /> II DATE: 9/24/74 <br /> EXTERIOR Gi EXTERIOR MUM N.T.S. <br /> mo.By-. J-K <br /> E I HORIZONTAL CROSS SECTION1'r21 HORIZONTAL CROSS SECTION CHK.are. LF—S <br /> Masonry Construction I X Buck Masonry Construction VERTICAL CROSS SECTION CPAWNG N04 <br /> 2X Buck Masonry Cristruction FL—16842.10 6 <br /> rs—N'Er, 3 or 6 10 <br />