Laserfiche WebLink
4 <br /> Snow Load 51-60 psf <br /> Modules in Landscape <br /> Wind Speed Exposure 2:12<Roof Pitch<.6:12 7:12<Roof Pitch- <br /> ASCE 7-05 ASCE 7-10. Cate o . Zone 1 Zone 2 'Zone-3 Zone 1 - Zone 2 Zone.3. <br /> B <br /> 85 niph. 110 mph C 42 <br /> D 35 <br /> B 54 <br /> 90 mph 115 mph C 38 <br /> D 51 32 <br /> B- 45 <br /> �100 mph . 125.mph C 51 32 <br /> D 43 . 27. <br /> B 36 <br /> 110 mph 140 mph C 41 26 <br /> D 34 22 <br /> B 50 31 <br /> 120 mph : 150 mph C. 36 22 . <br /> D_ 51.. 30' 19 <br /> Notes: <br /> Spacing Governed.by Snow Load <br /> 1.)Values in above table represent the maximum allowable spacing in Inches for pullout forces only on EcoFastan Solar standoff, <br /> however the.designer must round down to meet appropriate-rafter spacing <br /> 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" <br /> 3.):Maximum allowed standoff capcity=547#(per testing results) <br /> 4.)Includes additional factor of safety of 1.5 for lag pullout capacity <br /> 5.)Values based on a maximum.module width of 40" <br /> 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height <br /> 7.)All adjustment factors are set to 1.No site specific engineering is included In this table <br /> Snow Load 51-60 psf <br /> Wind-Speed Exposure 2:12<Roof Pitch a 6:12 7:12<Roof Pitch<12:12. <br /> ASCE.7-05 ASCE 7-10 Category Zone•1 Zone 2 Zone 3 Zone.1 .Zone 2 Zone.-3 . <br /> 85 mph 110 mph C 24 <br /> D (g32 20 <br /> B 30 <br /> 90 mph 115 mph C 22 <br /> D 29 18 <br /> B -28 _1 <br /> 100 mph 125 mph C 29.'• 18 <br /> D` ..�26 <br /> B 20 <br /> 110 mph 140 mph C 23 14 <br /> D 19 12 <br /> 120 mph , 150 mph C 20 12 <br /> _ D .29�, 17 _ 10___- = <br /> Notes: <br /> -Spacing.Govemed by Snow Load <br /> 1.)Values in above table represent the maximum allowable spacing In inches.for pullout forces only on EcoFasten Solar standoff <br /> -2.)Maximum allowed-spacing approved by EcoFasten Solar is 48" <br /> 3.)Maximum allowed standoff capcity=547#(per testing results) <br /> 4:)-Includes additional factor of safety of 1.5 for lag pullout capacity <br /> 5J Values based on a maximum module length of 70" <br /> 6.).Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height <br /> 7:)All adjustment factors are set to 1.No site specific engineering.is included In this table <br /> www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 12 <br />