Laserfiche WebLink
THermaL EXPansion anD BonDinG <br /> A thermal expansion gap is required per <br /> each continuous 40'length.of modules. -- Bond Path <br /> ® Grounding Lug <br /> Omit a coupling and leave a 2"gap in <br /> the Rock-it Array Skirt and also between ,---Equipment CV,- <br /> the modules at that point. s��lr"�`� <br /> ® ROrk-It Coupling <br /> ® Rock-It Mount <br /> _Rock-lt'Amay Skirt <br /> BracKeT sPacinG <br /> Portrait Orientation Landscape_Orientation <br /> I <br /> i I <br /> I <br /> I <br /> Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. <br /> 32mm modules:Max east/west bracket spacing-is 48"OC. <br /> I Spacing may vary depending upon project specific.structural requirements;I e.Ngh snow and wind load <br /> areas may require lesser spacing E-W than the maximum. <br /> sTaG.GereD LaYOUT canTiLever an.D oFFseT <br /> Staggered Mounting Points <br /> I <br /> .®Rock-It Mount ®Rock-it Coupling Cantilever. Maximum cantilever is 1/3 bracket spacing. For portrait <br /> orientation installations,check layout.priorto installing. <br /> The array layout instructions in this installation manual offer a <br /> general overview of layout. Periodically,due to a variety of Offset:Offset from all roof edges depends on wind speed,snow <br /> i'factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location <br /> www.ecofastensolarcom info@ecofastensolarcom -877-859-3947 14 <br />